How Is Epoxy Flooring Installed? Application in 7 Steps
Every stage of an epoxy flooring installation from survey to handover: surface preparation, repairs, primer, coating layer and curing.
Epoxy flooring can be walked on after about 24 hours at 20 °C, can be opened to light loads in 2–3 days and reaches full strength in 7 days. These times get longer as the temperature drops; below 10 °C curing slows down considerably.
"How long does epoxy flooring take to cure? When can we walk on it, and when can forklifts drive on it?" These are the first questions every business asks when planning an installation schedule. In this article we explain epoxy floor curing times, how temperature changes them, what to watch out for during curing and the fast-curing systems available for jobs on a tight schedule.
Epoxy does not dry through the evaporation of the water it contains, as water-based paints do. It hardens through the chemical reaction between the resin and the hardener. This process is called curing. Although the surface becomes touch-dry within a few hours, the material gains its real strength over a number of days. That is why putting loads on a floor too early just because it "looks dry" increases the risk of marks, indentation and chemical staining.
Exact times vary with the product used; the values in the product's technical data sheet always take precedence.
Curing time depends not only on temperature but also on the system applied:
The curing rate depends heavily on temperature. As a general rule, when the temperature drops by 10 °C, the time roughly doubles.
Below 10 °C, standard epoxies do not cure properly. For winter applications the space is heated, or special hardeners that cure at low temperatures are used. At high temperatures, on the other hand, pot life gets shorter; since the material can heat up and set quickly in the bucket, the crew works in smaller batches and at a faster pace.
Another factor as important as temperature is humidity. If the floor temperature approaches the dew point of the air, an invisible film of moisture forms on the surface. This moisture reacts with the hardener, causing whitening, tackiness and dulling on the surface. That is why the floor temperature is kept at least 3 °C above the dew point throughout the application; measuring is especially important in basements and cold stores.
Curing time is the most decisive part of the installation plan. In businesses that cannot stop production or service, the area is divided into zones, and work continues in one zone while another cures. Factories use weekends and public holidays, schools the summer break, hotels the low season, and hospitals a schedule that moves ward by ward. When curing time is built into the schedule from the very start, there is no need to open the floor early.
Yes. Fast-curing systems can be used for businesses that can only stop production for a short time; with these systems the floor can be opened to traffic within a few hours. They cost more and their application requires working faster. If your schedule is tight, telling us so when you request a quote ensures that the right system is selected. We explain how fast systems affect the price in our article 7 factors that determine the cost of epoxy flooring per m².
From the seventh day onward, the floor is ready for normal use and regular wet cleaning. Using a neutral detergent and avoiding abrasive products during the first few weeks helps the surface stay glossy for a long time. For a detailed cleaning schedule, take a look at our epoxy floor maintenance and cleaning guide.
For the other stages of the installation, see our article how is epoxy flooring installed, and to plan the right schedule for your space together, you can request a quote.
Every stage of an epoxy flooring installation from survey to handover: surface preparation, repairs, primer, coating layer and curing.
An epoxy floor needs little maintenance, but it should not be neglected. Everything you need to know, from daily cleaning and stain removal to the…
Why do epoxy flooring prices vary so much from one project to the next? We explain the items that make up the price so that you can compare quotes…
Our priority is
Tell us about your project, and together we will pin down the right epoxy system for your floor, the application time and our quote.
Get a Quote5-year workmanship and 10-year product warranty. We respond to all requests within 24 hours. We work in all 81 provinces.