School and Educational Facility Epoxy Flooring

School and Educational Facility Epoxy Flooring

Seamless, easy-to-clean epoxy flooring for classrooms, corridors, laboratories, workshops and the areas around sports halls, scheduled to fit into the school break.

In Brief

School epoxy flooring gives classrooms, corridors, laboratories and workshops a seamless, dust-free surface that wipes clean easily. Classrooms and corridors get 2–3 mm self-leveling epoxy, entrances and sink areas that get wet get a textured finish, and storerooms and plant rooms get epoxy paint. The work is scheduled for the summer or mid-year break; the floor can be walked on after about 24 hours and is fully cured in 7 days. Where an impact-absorbing floor is needed, such as under play equipment and on ball-game courts, epoxy on its own is not the right choice.

School and Educational Facility Epoxy Flooring

Why is epoxy chosen for school floors?

School epoxy flooring turns the hardest-working surface of an educational building, from the classroom to the laboratory and from the corridor to the workshop, into a single, seamless layer that wipes clean easily. Over the course of a day a school floor carries hundreds of pairs of shoes, desks being dragged around, spilled drinks and the rush of recess. What is more, all of this is repeated every day at the same hours and in the same corridors.

Terrazzo and ceramic tiles, which are common in educational buildings, hold dirt along their joint lines. The joints darken over time, and tiles that crack or work loose create a trip hazard. PVC-based floor coverings open up at the seams, and when water gets underneath they blister. Bare screed or concrete, meanwhile, gives off dust, and that dust ends up in the classroom air, in books and in computers.

An epoxy coating removes the common source of these problems, namely the joint and the pore. The surface does not absorb liquids, stains do not work their way in deep, and the cleaning staff can clean the same area in less time. Because the color range is wide, floors and departments can be told apart by color, and wayfinding lines and play patterns can be worked into the floor.

That said, epoxy is not a cure for every problem. It is a hard coating; it does not cushion a fall and it does not absorb sound. On this page we explain plainly which system is right for which space, and in which spaces epoxy alone is not enough.

Where is epoxy flooring used in educational institutions?

What is expected of the floor on a campus changes from space to space. A playroom in a kindergarten and a lathe workshop in a vocational high school are not solved with the same system. Below you will find the areas we come across most often in educational buildings and what we look at in each of them.

Universities

A university campus is not a single building but something like a small town: lecture halls, the library, the dining hall, research laboratories, dormitories and parking garages are all the responsibility of the same administration. That is why it calls for a flooring plan that varies by space rather than a single system. We use 2–3 mm self-leveling epoxy in corridors and foyers that carry heavy student traffic, epoxy floor paint in archives and plant rooms, and a textured system in wet sections such as the dining hall kitchen.

For the electronics and cleanroom sections of research centers, anti-static epoxy comes into consideration. In the enclosed parking garages on campus, the principles on our parking garage epoxy flooring page apply. The hardest part of the job at universities is the calendar: because of summer school, make-up exams and conferences, the buildings never empty out completely, even in summer. For this reason the work has to be phased faculty by faculty, and even floor by floor.

Schools: elementary, middle and high schools

In elementary, middle and high schools, two things are hardest on the floor: the desks and chairs that are pushed back and forth in every lesson, and the sand carried in from the schoolyard. Grains of sand work like sandpaper under the soles of shoes, and they wear down entrance halls and the heads of staircases most of all. In classrooms and corridors, self-leveling epoxy stands up to the scraping of desk legs far longer than a thin-film paint.

Finishing the surface in satin or matte rather than gloss both hides fine scratches and reduces the reflection of light from the windows onto the board and into the eyes. A lightly textured finish is preferred in the entrance hall, which people walk into with wet shoes on rainy days, on stair landings and in front of sinks. If a different color is chosen for each floor, younger students find their own floor easily. If a school's existing terrazzo tile floors are sound, they can be coated without being taken up, by grinding and priming them; this also makes it easier to fit the job into the break.

Kindergartens and daycare centers

In a kindergarten, children spend most of their time on the floor: they sit, they crawl, they spread their toys out on the ground. That is why a seamless surface that wipes clean easily is a matter of hygiene here before it is a matter of appearance. Spilled fruit juice, finger paint and modeling clay clean off an epoxy surface without leaving a mark. We use solvent-free systems; the main point to watch is that children are not allowed into the space before curing is complete.

Epoxy is a hard floor and does not cushion a fall. An impact-absorbing floor is needed under play equipment such as climbing frames and slides; in these zones epoxy on its own is not the right choice, and we state this plainly at the quotation stage. In the playroom, the dining room, the nap room and the corridors, on the other hand, vivid colors with hopscotch and roadway patterns produce a surface that children love and that the teacher can keep clean with little effort.

Vocational high schools

Vocational high schools house a small industrial plant inside the school building. The engine, metalwork, electrical, furniture and food-and-beverage departments each stress the floor in a different way. In the motor vehicles department, oil and fuel drip onto the floor, and jacks and stands create point loads; the conditions are no different from those of a service bay, and we apply the quartz-filled system described on our auto repair shop epoxy flooring page.

In the metalwork and machining departments there are metal chips, coolant and dropped workpieces; in the furniture department, drips of varnish and thinner are added to these. If sensitive circuit work is carried out in the electrical and electronics department, an anti-static floor is considered. In training kitchens, a textured finish is essential against a wet and greasy floor. We also mark the safety boundaries around machines, the pedestrian walkways and the emergency exit routes on the floor with lines. That way, students get used to the floor-marking conventions of the factory they will work in later while they are still at school.

Laboratories

In science, chemistry and biology laboratories, what is expected of the floor is that it does not absorb spilled liquids and can be decontaminated easily. Epoxy resists dilute acids, alkalis, salt solutions and many cleaning chemicals. However, concentrated acids and some strong solvents can cause dulling or discoloration if they are left on the surface for a long time. For this reason, wiping up spills without delay should be part of the laboratory routine.

If we know the list of chemicals in use beforehand, we select the topcoat accordingly. Forming a coved skirting along the base of the walls prevents spilled liquid from collecting in the corner. In laboratories that have an emergency shower and eyewash station, the area around that point is given an anti-slip texture. The floor around bench and cabinet legs is detailed one by one; where possible, fixed furniture is installed after the coating. In computer, robotics and electronics laboratories, an anti-static system can be chosen, because static discharge can damage circuit boards. In medical and health sciences laboratories, the expectations come close to those described on our hospital epoxy flooring page.

Workshops

Art, ceramics, woodworking and design-and-technology workshops are far dirtier and busier spaces than classrooms. Acrylic paint, glue, clay slip, plaster and sawdust fall on the floor; heavy workbenches and wheeled material carts are moved around frequently. On bare screed these stains are permanent, whereas on an epoxy surface most of them come off with a damp cloth or a plastic scraper.

In workshops we generally apply 2–3 mm self-leveling epoxy. In sections that are washed down often and where muddy water runs, such as the ceramics workshop, a lightly textured finish is safer. Color choice is functional here: a mid-tone gray or beige shows both paint stains and dust less than very light or very dark colors do. In woodworking shops, care is taken under the machines and around the dust extraction lines. The yellow safety boundary drawn around the machines also makes it easier for the teacher to keep the workshop in order.

Sports halls

In school sports halls, an honest distinction has to be made first. On courts where basketball, volleyball and handball are played, the floor is expected to absorb impact and to show a certain degree of resilience. Epoxy is a hard coating; on playing courts of this kind it is not the right choice on its own, and we say so plainly at the quotation stage.

Where epoxy is strong is around the hall: locker rooms, the corridors leading to the showers, equipment storerooms, the spaces under the bleachers, weight corners and multipurpose halls. People walk barefoot and with wet feet in locker rooms and around showers; here an anti-slip texture and a fall toward the drains are important. In weight areas, rubber tiles need to be laid over the coating to protect it from dropped barbells. In multipurpose halls that are also used for ceremonies and exams, self-leveling epoxy stands up well to chair and stage traffic. For details, see our gym and sports hall epoxy flooring page.

Which epoxy system should be chosen?

Coating an entire school with a single system means both unnecessary cost and the wrong performance. The right approach is to divide the building into zones according to how they are used and to give each zone as much coating as it needs.

  • Classrooms, corridors, the library and the teachers' lounge: Self-leveling epoxy, 2–3 mm. It resists the scraping of desks and chairs and, being seamless, is quick to clean. A matte or satin finish is recommended.
  • Entrance hall, stair landings, ramps and sink areas: Textured (anti-slip) epoxy. It reduces slipping in wet shoes; the texture is chosen fine enough not to make cleaning harder.
  • Archives, storerooms, the boiler room, shelters and basement spaces: Epoxy floor paint. Because traffic is light, a thin film is sufficient; it stops dusting economically.
  • Electronics and IT laboratories, server rooms: Anti-static epoxy. It carries static charge to ground through copper tape and conductive layers.
  • Entrance foyer, the area outside the conference hall and exhibition areas: Metallic and decorative epoxy. It is preferred in the representative areas where the institution welcomes its visitors; a protective topcoat is applied over it.
  • Glass-fronted, sunlit corridors and atriums: A polyurethane topcoat over the epoxy. Epoxy can yellow over time in direct sunlight; the topcoat delays this effect.

School and university kitchens where meals are cooked are a separate subject. Because grease, hot water and frequent washing are involved, the criteria on our food processing plant epoxy flooring page apply to these areas.

How is epoxy flooring installed in a school?

  1. Site survey and measurement: The areas are measured, the type and soundness of the existing floor covering are checked, and the moisture content of the concrete is measured. Together with the administration, we fix on the calendar which space will be vacated on which date.
  2. Clearing and protection: Desks, cabinets and boards are removed from the area. The base of the walls, door frames and fixed benches are masked, and the area is sealed off from the sections that must be kept clear of dust.
  3. Surface preparation: The concrete or terrazzo is opened up with a diamond grinding machine fitted with dust extraction. Any PVC covering is stripped and the adhesive residue is removed completely. Loose tiles are lifted.
  4. Repairs: Cracks, broken corners and the voids left by lifted tiles are filled with an epoxy-based repair compound. When working over ceramic tiles, the joint lines are closed with filler.
  5. Primer: Epoxy primer is worked into the surface; it seals the pores and makes the coating bond to the substrate.
  6. Coating: Depending on the system chosen, self-leveling epoxy is spread with a notched trowel and de-aerated with a spiked roller, quartz sand is broadcast in the textured system, or the paint is applied in two coats by roller.
  7. Lines, patterns and details: Play patterns, wayfinding lines, workshop safety boundaries and coved skirting are completed.
  8. Curing and handover: The floor can be walked on after about 24 hours. Full cure takes 7 days at 20 °C; we recommend that desks and cabinets are put back with this period in mind.

Fitting it into the school break: timing and phasing

In schools, flooring work starts with the calendar. No application is carried out while students are in the building, so the work is slotted into the gaps in the academic calendar. Working out realistically how much work will fit into which gap is as important as choosing the system.

  • Summer break: This is the most suitable period for renovating the whole building. However, wall painting, plumbing and joinery work are also carried out in the same period. The floor coating should be left until the very end of these jobs; otherwise scaffold feet and paint drips will damage the new surface.
  • Mid-year break: It allows one floor or one department to be coated. Because it falls in the winter months, the building's heating must be kept on; epoxy cures slowly at low temperatures.
  • Short term breaks: These can be used for limited areas such as one laboratory, one workshop or a single corridor.
  • Weekends: They are sufficient for epoxy paint applications in small, unfurnished areas such as storerooms, archives and sink areas. Furnished spaces such as classrooms should not be squeezed into a weekend.

When calculating the duration, curing counts as well as the application days. About 24 hours is enough for foot traffic; but full cabinets and row upon row of furniture have to wait until the floor reaches its full strength. For this reason we recommend planning the work so that it finishes at least one week before the school opens.

In large schools, splitting the work by floor and having the crews follow one another shortens the schedule: while grinding is under way on one floor, primer is being applied on another. Because all educational institutions empty out at the same time in the summer months, completing the quotation and site survey in the spring takes the pressure off the calendar.

School and Educational Facility Epoxy Flooring – application view

What we look out for in terms of child and student safety

On a school floor, safety covers the application process as much as the coating itself. We address the following points separately on every education project.

  • Balancing slip resistance: Smooth, glossy epoxy is safe when dry but can become slippery when wet. A textured surface is chosen at every point that is likely to get wet. In corridors and entrances that get wet only occasionally, a fine texture is usually enough; a texture that is coarser than necessary makes cleaning harder and grazes the knee of a child who falls.
  • Contact with uncured material: The application area is closed off with barriers and the doors are locked. Leftover material, empty packaging and used rollers are removed from the school when the work is finished.
  • Odor and ventilation: Solvent-free systems have a low odor; even so, the windows are kept open and the space is ventilated throughout application and curing.
  • Trip hazard: A thickness of 2–3 mm causes no problems under doors. Transitions to other floor coverings are feathered flush so that no step is left for a foot to catch on.
  • Wayfinding: Emergency exit routes, the heads of staircases and hazardous zones in workshops can be marked on the floor in a different color.

Two limits also need to be stated plainly. Epoxy does not reduce the effect of a fall; under play equipment and on ball-game courts, a separate impact-absorbing floor is required. Nor does epoxy absorb sound; if echo is a problem in long corridors, the solution lies not in the floor but in acoustic treatment of the ceiling and walls.

Common mistakes

  • Coating a ground floor without measuring moisture: Moisture can rise from below in ground-floor slabs that sit on the soil. If the moisture content of the concrete is not below 4%, the coating will blister over time. Work should not begin before a measurement has been taken.
  • Coating over adhesive residue: If the adhesive from stripped PVC is left on the surface, the epoxy bonds not to the concrete but to that residue, and it lifts off in sheets.
  • Coating over loose tiles: If hollow tiles that do not give a solid sound when tapped are coated without being lifted, a crack forms at that point.
  • Making do with paint in the corridor: A thin-film paint wears through in a short time in a corridor that hundreds of students pass along, and under desks. Paint is for storerooms and plant rooms.
  • Closing a structural joint with the coating: If the building's expansion joints are left beneath the coating, movement cracks the coating. The joint is left open and filled with a flexible sealant.
  • Putting the desks back too early: Heavy furniture lined up on a surface that has not finished curing leaves marks.
  • Applying to new concrete straight away: In annex buildings or on newly poured screeds, the concrete is expected to be at least 28 days old.

Cleaning and maintenance

The greatest benefit of an epoxy floor in a school is that it shortens daily cleaning. On smooth surfaces, dry dust mopping followed by a damp mop with a neutral detergent is sufficient. A floor scrubber can be used in wide corridors. Textured zones should be cleaned with a brush, not a mop; otherwise dirt settles into the texture.

A few habits specific to schools extend the life of the floor noticeably:

  • Entrance matting: Sand from the schoolyard is the floor's greatest enemy. A mat of sufficient length at the entrance that traps sand stops most of the wear at the door.
  • Desk and chair glides: If the plastic glides on the ends of metal legs are missing, they should be fitted, and if they are broken, they should be replaced. A bare metal leg scratches any surface.
  • Stain removal: Chewing gum is chilled and lifted with a plastic scraper. Ink and marker pen stains are wiped off with a suitable cleaner without delay. Abrasive powders and steel wool are not used.
  • Annual inspection: Every summer break, the areas in front of doors, the heads of staircases and the floor under desks are checked. Zones that have dulled can be lightly sanded and renewed with a fresh topcoat; there is no need to redo the entire floor.

Polish must not be used in laboratories with an anti-static floor; polish forms an insulating film and reduces the conductivity of the floor.

For a daily, weekly and yearly maintenance schedule and cleaning tips for each type of stain, see our guide Epoxy Floor Maintenance and Cleaning.

What determines the cost?

In educational institutions the flooring budget is usually fixed in advance. To stay within that budget, you need to know the items that make up the cost.

  • Total area and how divided up it is: The same number of square meters does not call for the same labor around a single sports hall as it does in thirty separate classrooms. A large number of small rooms, door thresholds and corners increases the labor.
  • Condition of the existing floor: PVC removal, broken tile repair, joint filling and any leveling that is needed determine the preparation cost.
  • System and thickness: Epoxy paint is the most economical; self-leveling and textured systems are thicker and longer-lasting. Anti-static and metallic systems involve special materials and workmanship.
  • Details: Coved skirting, play patterns, lines, the number of colors and stair landings are separate items.
  • Schedule pressure: Fitting a large area into a short break means a larger crew and shift work.
  • Access: Carrying materials and machines to upper floors without an elevator lengthens the job.

If the budget is limited, it is possible to spread the work over several years: first the ground floor and corridors, which suffer the most wear, and then the classrooms in the next break. Because the color and system are decided in the first phase, the later phases continue with the same look.

We explain what to look for when comparing quotes in our article 7 Factors That Determine the Cost of Epoxy Flooring per m².

Getting a quote

We set out the right system and a realistic schedule for your school in a written quote prepared from the information and photos you send us; once the quote is approved, we survey and measure the area on site. As a first step, you can fill in the quote request form. Including the following information makes our work easier:

  • The type of institution and the country and city where it is located,
  • The spaces to be coated and their approximate areas in square meters (classrooms, corridors, laboratories, workshops and so on),
  • The type of existing floor: terrazzo, ceramic tile, PVC or screed,
  • The date range in which the work can be carried out and the date the school opens,
  • The chemicals or machines used in the laboratories and workshops,
  • A few photos of the floor, if available.

You can review all the systems we install on the services page and our solutions for other industries on the sectors page. For questions, you can reach us through the contact page.

What Epoxy Flooring Delivers in This Sector

  • Seamless surface that holds no dirt or dust
  • Resists the scraping of desks and chairs
  • Anti-slip texture at entrances and sink areas that get wet
  • Wide color range to tell floors and departments apart
  • Play patterns, wayfinding and safety lines
  • Installed over sound terrazzo and ceramic tiles without removal
  • Work program phased around the school break
  • Shorter daily cleaning

Areas Where It Is Applied

  • Universities
  • Schools
  • Kindergartens
  • Vocational high schools
  • Laboratories
  • Workshops
  • Sports halls

Technical Details

Classrooms and corridorsSelf-leveling epoxy, 2–3 mm
Wet areas and areas near entrancesTextured (anti-slip) epoxy
Storerooms, archives and plant roomsEpoxy floor paint, 0.3–0.5 mm
Surface preparationDiamond grinding with dust extraction
Open to foot trafficApprox. 24 hours
Full cure7 days (20 °C)
Application periodSummer, mid-year and short term breaks

Frequently Asked Questions

Can epoxy flooring in a school be completed within the summer break?

Yes, in most schools coating every floor fits comfortably into the summer break. What determines the duration is not so much the square meters as the condition of the existing floor and the other renovation work carried out in the same period. The floor is done last, after the painting and plumbing work has finished. The coating can be walked on after about 24 hours and reaches full strength in 7 days, so the aim is to finish the job at least one week before the school opens.

Does epoxy flooring smell, and when can children go back into the building?

Solvent-free epoxy systems are used in schools; their odor during application is far lower than that of solvent-based paints. Even so, the space is ventilated throughout application and curing, and the area is kept closed to students. Foot traffic is allowed after about 24 hours; however, in spaces such as kindergartens where children play on the floor, we recommend waiting for the full cure time of 7 days.

Can epoxy be applied over existing terrazzo or ceramic tiles without removing them?

If the floor is sound, yes, it can be coated without removal. First the tiles are checked one by one; loose pieces that have come away from the bed underneath are lifted and the gaps are filled. The surface is then roughened by diamond grinding, the joint lines are closed with filler and a suitable primer is applied. This method is often chosen in schools because it produces no rubble and shortens the schedule. PVC coverings, on the other hand, are always stripped and the adhesive residue is cleaned off.

Do desks and chairs scratch an epoxy floor?

Desks and chairs whose plastic glides are in place do no lasting damage to 2–3 mm self-leveling epoxy; the fine marks that form on the surface over time are barely noticeable on a matte or satin finish. The real causes of scratching are bare metal legs that have lost their glides and sand carried in on shoes. Checking the glides at the start of each term and placing a sand-trapping mat at the entrance are sufficient precautions. Worn zones can later be renewed with a fresh topcoat.

Is epoxy flooring suitable for a school sports hall?

For the playing court itself, epoxy is usually not the right choice, because in ball games the floor is expected to absorb impact and epoxy is a hard coating. In locker rooms, shower corridors, equipment storerooms, the spaces under the bleachers and multipurpose halls, on the other hand, epoxy performs well. An anti-slip textured system is used in sections where people walk with wet feet. At the quotation stage we state separately which section is suited to which floor.

Does an epoxy floor in a chemistry laboratory resist acids?

An epoxy floor resists the dilute acids and alkalis, salt solutions and cleaning chemicals used in school laboratories. Concentrated acids and some strong solvents, however, can cause dulling or discoloration if they stay on the surface for a long time. For this reason, spilled chemicals need to be wiped up immediately. If you add the list of substances used in the laboratory to the quote request form, we select the topcoat to suit those substances.

Guides and Articles on This Topic

All Articles

Epoxy Types Used in This Sector

All Services

Turn your floor into a durable, hygienic and attractive surface.

Our priority is

Tell us about your project, and together we will pin down the right epoxy system for your floor, the application time and our quote.

Get a Quote

5-year workmanship and 10-year product warranty. We respond to all requests within 24 hours. We work in all 81 provinces.