Self-Leveling Epoxy Flooring

Self-Leveling Epoxy Flooring

A solvent-free epoxy coating that flows out on its own into a seamless, smooth and glossy surface 2–3 mm thick; for factory, warehouse, laboratory and retail floors.

In Brief

Self-leveling epoxy flooring is a seamless, smooth and dust-free coating, 2–3 mm thick, that spreads out on its own once the resin and hardener have been mixed and poured onto the floor. It is spread with a notched trowel and de-aerated with a spiked roller; it can be walked on after about 24 hours and cures fully in 7 days at 20 °C. Because its surface is flat it can become slippery when wet; in wet areas textured epoxy is chosen.

Self-Leveling Epoxy Flooring

What is self-leveling epoxy flooring?

Self-leveling epoxy flooring is a seamless coating, 2–3 mm thick, that spreads and levels out under its own weight when it is poured onto the floor. It is also known as "self-smoothing epoxy" or simply as a poured epoxy floor. From factory aisles to laboratories and from warehouses to retail stores, it is the epoxy system chosen most often for floors that are expected both to carry loads and to look immaculate.

The material has two components: an epoxy resin and a hardener. When the two are mixed in a fixed ratio a chemical reaction begins, and within hours the liquid mixture sets into a hard, impermeable layer. The system contains no solvent; because nothing evaporates into the air as it cures, the thickness that is poured stays on the floor, and the odor during application is far lower than with solvent-based paints.

The term "self-leveling" is sometimes misunderstood. The material does not put a poor slab right by itself; it is drawn out to an even thickness with a notched trowel, the air trapped in it is released with a spiked roller, and only then does it close up the trowel marks and form a flat film. The quality of the finished surface therefore depends on the quality of the preparation beneath it.

The cured floor is seamless, does not dust, does not absorb liquids and is not crushed under wheels. The porous, dusting surface of the concrete is sealed off completely.

What layers make up the system?

Self-leveling epoxy is not a single coat but a system of layers that bond to one another. Each layer has a job of its own; when one is skipped, the problem usually shows up months later.

  • Prepared concrete: This is what carries the system. A coating is only as strong as the concrete it is bonded to; for this reason the weak laitance layer on the surface is removed by diamond grinding or shot blasting and the pores are opened up.
  • Epoxy primer: The free-flowing primer penetrates the pores of the concrete, binds the surface and makes the upper coats adhere. It also prevents the air in the concrete from rising into the coating as bubbles. On very absorbent concrete a second coat of primer may be needed.
  • Filler coat (if needed): If the floor is rough, porous or slightly undulating, epoxy thickened with fine quartz sand is drawn tightly over the primer with a steel trowel as a scrape coat. This coat fills small voids and allows the body coat to spread at an even thickness. On flat, dense concrete it may not be necessary.
  • Self-leveling body coat: This is the coat that gives the system its real thickness, its color and its strength. It is generally applied at 2–3 mm; depending on requirements it can go down to 1.5 mm or up to 5 mm.
  • Topcoat (optional): If a matte or satin look, higher scratch resistance or protection against yellowing in sections that receive sunlight is wanted, a polyurethane topcoat is applied to the surface.

The waiting time between layers is part of the system too. A coat is applied once the one beneath it has hardened enough to be walked on, but without too long a delay, so that the coats bond firmly to each other. If that window has been missed, the surface of the lower coat is sanded to roughen it again.

What does self-leveling epoxy deliver?

The system owes its popularity not to a single property but to the fact that it offers several benefits at the same time.

  • A dust-free floor: Bare concrete gives off a fine dust as it is walked on and as wheels roll over it. That dust settles on machines, products and racks. Because the epoxy coat covers the concrete completely, dusting is cut off at the source.
  • A seamless, impermeable surface: Tile joints hold dirt, oil and microorganisms. On a seamless surface liquids cannot soak in; spilled oil or chemicals stay on the surface and are wiped away.
  • Durability under wheels: The 2–3 mm body stands up to the friction of pallet jack and forklift wheels far longer than thin-film paints do, and it spreads the load into the concrete.
  • Chemical resistance: Machine oil, fuel, salt water and most dilute acid and alkali solutions do not harm the coating. Where concentrated acids and strong solvents are involved, the product is selected according to the chemical that will be spilled.
  • A bright, orderly appearance: The glossy surface reflects light, so the space looks brighter under the same lighting. Leaks, spills and parts dropped on the floor are noticed at once.
  • Order through color: Walkways, forklift routes, stacking areas and hazard zones can be marked on the floor in a different color or with lines.
  • Easy cleaning: On a smooth surface dirt finds nowhere to cling; a scrubber-dryer cleans it in a single pass.
  • Renewability: A surface that has dulled or been scratched over the years is not ripped out; it is sanded and refreshed with a new coat applied on top.

Limits: when is self-leveling epoxy not the right choice?

No single system suits every floor. Knowing from the start the conditions in which self-leveling epoxy falls short heads off the problems that would otherwise appear later.

  • Wet and oily areas: A flat, glossy surface is safe when dry; with water, oil or detergent on it, it can become slippery. In production areas that are constantly wet, in wash-down sections and on ramps, textured anti-slip epoxy is chosen.
  • Damp concrete: If the moisture content of the concrete is above 4%, or if water vapor pressure is coming up from beneath the slab, the coating will blister over time. The source of the moisture is dealt with first; we do not apply to concrete that is not dry.
  • Fresh concrete: The concrete must be at least 28 days old. Younger concrete is still damp and has not finished shrinking.
  • Outdoors and direct sunlight: Epoxy yellows in sunlight, and its surface dulls and chalks. In indoor sections that receive sunlight a polyurethane topcoat delays the yellowing; in areas that are fully outdoors, however, epoxy is not the right choice, and we say so clearly at the quotation stage.
  • Continuous hot water and steam: Where the floor is continually washed with hot water above 60 °C or subjected to steam shock, an epoxy coating cannot withstand the thermal stress. In such conditions we do not recommend epoxy.
  • Heavy impact: In areas where heavy metal parts are frequently dropped or steel-wheeled trolleys are in use, a 2–3 mm coating is pushed to its limit. Here a thicker, quartz-filled textured system lasts longer.
  • Moving cracks and weak screed: A coating does not strengthen concrete. If the screed beneath it is hollow or a crack is live, the problem is reflected through to the surface; the substrate is repaired first.
  • Areas where only dust-proofing is wanted: For a low-traffic archive, plant room or small storeroom, a 2–3 mm system is more than is needed; epoxy floor paint does the same job more economically.

Where is self-leveling epoxy flooring used?

The system suits almost any indoor space that works dry and carries heavy wheeled traffic. Below we summarize the types of space where we apply it most often, and the detail that matters most in each of them.

Factories and production areas

Assembly lines, machine halls, packaging sections and in-plant aisles are the most common places where self-leveling epoxy is used. All day long the floor carries pallet jacks and forklifts, machine oil drips onto it, and swarf and dust build up. The seamless surface does not absorb oil, and sweeping and washing become easier. The points where machine feet sit, the edges of channels and the joints are dealt with one by one before application. In the sections of production that work wet, we switch to the textured system in the same color. For details, see our factory epoxy flooring page.

Warehouses and logistics centers

In warehouses, what wears the floor is hard wheels turning thousands of times along the same route. Self-leveling epoxy is used in busy forklift aisles, in picking and packing areas and in front of the shipping doors. In high-bay warehouses with narrow aisles, the flatness of the floor also matters for the safe operation of the stacker truck; since the coating does not remove large differences in level in the concrete, this is addressed separately at the preparation stage. In large sections that see no traffic, such as the areas under the racks, it can be combined with epoxy paint to balance the budget. The details are on the warehouse epoxy flooring page.

Hospitals, laboratories and cleanrooms

In healthcare areas, what is expected of the floor is that it leaves no joints or pores for microorganisms to cling to. When self-leveling epoxy is joined to a coved skirting detail at the base of the wall, no sharp corner is left between floor and wall and the surface becomes suitable for frequent disinfection. In laboratories, spilled stains and solutions are wiped off the surface. In the cleanrooms of pharmaceutical and cosmetics production, a floor that does not dust or shed particles is the basic requirement. In rooms where static electricity is a problem, the conductive version of the system, anti-static epoxy, is used. We describe these areas in detail on the hospital epoxy flooring page.

Retail stores, supermarkets and showrooms

In commercial spaces, self-leveling epoxy gives a plain floor whose seamless, single-color look lets the product stand out. Shopping carts roll without rattling, and a corporate color can be repeated in the same shade at every branch. Here the conversation is about appearance more than durability: a glossy surface multiplies the light but also shows fine scratches; under heavy foot traffic a matte or satin topcoat is usually the better choice. The fact that it can be applied over sound ceramic tiles without any demolition shortens the refurbishment time. For details, see the shopping mall and retail store epoxy flooring page.

Schools, offices and shared areas

In corridors, classrooms, workshops, dining halls and office floors, self-leveling epoxy offers a floor that is easy to clean, seamless and quiet under wheels. In these spaces the deciding factor is fitting the work into the holiday period; the phases are therefore planned from the outset with the curing times in mind. Because sand carried in on shoes dulls the surface under heavy student traffic, we recommend entrance matting and a matte finish. In wet rooms and on entrance landings we switch to a textured finish. The details are on the school epoxy flooring page.

Auto repair shops and workshops

In service reception areas, mechanical workshops and spare parts stores, the floor meets engine oil, fuel and antifreeze. Self-leveling epoxy does not absorb these liquids; when a spill is wiped up without delay no mark is left, and the reception area that the customer sees looks well kept. Because the areas under lift posts and the points where jacks are used carry point loads, the soundness of the concrete in these zones is checked separately. For the wash bay and the ramps the textured system is chosen. The details are on the auto repair shop epoxy flooring page.

The application, step by step

The success of self-leveling epoxy depends largely on the work done before the pour. The application proceeds in the following order:

  1. Site survey and measurement: The age, soundness, moisture content and flatness of the concrete are checked, and the area is measured. Joints, channels, thresholds and machine feet are noted. The system and the thickness are finalized on the basis of this data.
  2. Surface preparation: The concrete is opened up by diamond grinding or shot blasting. The aim is to remove the weak laitance, old paint residue, oil and dirt, and to leave a rough, open-pored surface for the primer to key into. The floor is then cleared of dust with an industrial vacuum cleaner.
  3. Repairs: Cracks are cut open and filled with epoxy repair compound; broken joint edges and pits are made good. The movement joints of the concrete are not sealed over by the coating; after coating they are cut open along the same line and filled with a flexible sealant.
  4. Primer: Epoxy primer is worked into the concrete with a roller or a squeegee. In absorbent zones, places that stay matte are primed a second time, because an unsaturated pore comes back as pinholes and bubbles in the coat above.
  5. Filler coat: On rough or porous floors, quartz-filled epoxy is drawn over the surface as a scrape coat. This coat evens out both the thickness of the body coat and the consumption of material.
  6. Pouring the self-leveling coat: The resin and hardener are blended with a low-speed mixer, with the bottom and sides of the container scraped down. The mixture is poured onto the floor without delay and spread with a notched trowel; the height of the notches determines the thickness of the coat. The crew works without a break so that the poured strips meet one another while they are still wet.
  7. De-aeration: A spiked roller is passed over the spread material. The spiked roller releases the air trapped in the mix and helps the trowel marks to close. At this stage the applicators walk on the wet surface in spiked shoes.
  8. Topcoat, lines and details: If required, a matte or scratch-resistant topcoat is applied; walkway and safety lines are painted, the joints are filled, and the skirting and threshold details are completed.
  9. Curing: The floor can be walked on after about 24 hours. It reaches its full mechanical and chemical resistance in 7 days at 20 °C; heavy loads, forklift traffic and chemical contact should begin only after this period.

Site conditions affect the result directly. When the floor temperature drops below 10 °C, curing slows down markedly, the material thickens and it becomes harder to spread. In very hot weather, on the other hand, the working time of the mix is shortened. Throughout the application, doors and windows are kept closed against dust and drafts; dust and insects that land on the wet surface stay in it once it has cured.

In premises that are in operation, the area is divided into zones and the work is carried out phase by phase. In each phase one section is closed off while work continues in the neighboring sections. Making the phase boundaries coincide with a joint line or a door threshold keeps the day joint from catching the eye.

Self-Leveling Epoxy Flooring – application view

Color, finish and thickness options

Self-leveling epoxy is applied in a wide choice of colors from the RAL chart. In industrial areas light and mid-gray shades are preferred most; these are the colors that show dust and wheel marks the least. Very light colors accentuate tire marks, while very dark, glossy colors accentuate dust and fine scratches. Deciding on the color by looking at it under the lighting of the space itself reduces the chance of a mistake.

There can be small differences in shade between different production batches of the same color. For this reason we take care to pour a single room with material from the same batch and, if possible, in one go.

There are three options for the finish:

  • Gloss: This is the natural finish of the system. It reflects light and is the easiest surface to clean; on the other hand, it is also the one that shows scratches and any undulation beneath it the most.
  • Satin: It softens the reflection and shows everyday marks less. It is a balanced choice for stores, schools and offices.
  • Matte: It is obtained with a matte topcoat. It does not dazzle, and it hides scratches and footprints; it suits areas with heavy foot traffic.

The thickness is determined by the load in use. In areas such as offices and classrooms, with foot traffic and light trolleys, 1.5–2 mm may be sufficient. In production and warehouse areas where pallet jacks and forklifts operate, the standard is 2–3 mm. Under heavier wheel loads the thickness can be increased up to 5 mm. As the thickness increases, strength and service life increase, and material consumption rises in the same proportion.

Markings such as walkways, forklift routes, stacking limits, direction arrows and numbers can also be worked into the floor. The lines are painted on top of the coating; under wheels they last far longer than adhesive tapes.

Comparison with the other epoxy systems

Each of the five systems we apply answers a different need. In most facilities it is not one system but two or three that are used together, section by section.

How it differs from epoxy floor paint

The basic difference is thickness. Epoxy floor paint is a thin film of 0.3–0.5 mm applied by roller; self-leveling is a poured coating of 2–3 mm. Paint shows the texture and small defects of the concrete just as they are, whereas self-leveling covers them and forms a flat surface. Under heavy forklift and pallet jack traffic paint wears quickly; self-leveling carries the same traffic for far longer. On the other hand, in low-traffic storerooms, archives and plant rooms where the only aim is to stop dusting, paint is markedly more economical. The decision is made by what passes over the floor and how often.

How it differs from textured anti-slip epoxy

The two systems belong to the same resin family; the difference is at the surface. Self-leveling is smooth, while the textured system is rough with quartz sand. A smooth surface is easier to clean and looks more even, but it can become slippery when wet. A textured surface grips feet and wheels in wet and oily conditions and, with its thick body, is more resistant to impact; in return, cleaning it calls for a machine fitted with brushes. Self-leveling is the right choice in dry areas, the textured system in wet areas and on ramps. In the same facility the two systems can be applied side by side in the same color.

How it differs from metallic epoxy

Self-leveling is a plain, single-color floor; metallic epoxy, by contrast, is a decorative coating that uses metallic pigments to give a marble or cloud effect. Although their build-ups are similar, their purposes are different: self-leveling is for functional areas that carry loads, metallic for the front-of-house areas that the customer sees. Using metallic in the sales area of a showroom and self-leveling in the storeroom and service workshop behind it is a common combination.

How it differs from anti-static epoxy

In appearance anti-static epoxy closely resembles a self-leveling floor; the difference lies inside the coating. Standard self-leveling epoxy does not conduct electricity, and a static charge can build up on it. In the anti-static system, copper tape, a conductive primer and a conductive body coat carry this charge to the grounding line. An anti-static system is required where static discharge poses a risk, such as electronics manufacturing, data centers, operating rooms and explosive atmospheres; in all other areas standard self-leveling is sufficient.

Common mistakes

  • Skipping surface preparation: A coating applied to concrete that has merely been swept lifts off together with the weak laitance layer it is bonded to. This is the cause of most blistering and peeling.
  • Starting without measuring moisture: Concrete can hold moisture even when it looks dry. In a coating poured without a measurement, blisters appear weeks later.
  • Skimping on the primer: On absorbent concrete a single coat of primer may not be enough; unsaturated pores produce pinholes and craters in the coat above.
  • Mixing in the wrong ratio or incompletely: If the ratio of resin to hardener is off, or if the material at the bottom of the container is not blended in, soft, sticky patches that never harden are left on the floor.
  • Being late with the spiked roller: If the air is not released, bubbles and pits remain in the surface; rolling done after the material has thickened, on the other hand, leaves marks.
  • Reducing the thickness: A coat drawn thin to save on material cannot level itself; trowel marks show and durability falls.
  • Leaving joints under the coating: If a working joint in the concrete is sealed over, the same line comes up through the surface as a crack before long.
  • Loading the floor too early: Being walkable does not mean being ready for racking to be installed or forklifts to be driven in; full strength develops in 7 days.
  • Choosing a smooth coating for a wet area: Applying glossy self-leveling to a section that is constantly washed down creates a workplace safety problem.

Cleaning and maintenance

A smooth surface makes maintenance easy. For daily cleaning a dust mop or an industrial vacuum cleaner is enough, and for the weekly clean a scrubber-dryer with a soft pad and a neutral detergent. Spilled oil and chemicals should be wiped up without delay; the coating does not absorb them, but a liquid left on the surface for a long time can leave a stain and makes the floor slippery.

What wears a self-leveling floor most is sand. Grains of sand carried in on shoes and wheels dull the surface like sandpaper. Mats placed at the entrances and regular sweeping are the most effective measures for preserving the gloss. Pallets and metal crates should not be dragged but lifted and carried; the nail of a dragged pallet will scratch any hard coating.

Abrasive powder cleaners, wire brushes and hard pads should not be used. The black marks left by forklift tires are mostly on the surface and come off by machine with a suitable detergent. If a piece of the coating breaks away as a result of an impact, the spot should be repaired without delay; oil and water that soak into the exposed concrete can travel under the coating from its edge.

If dulling or thinning is seen along the main traffic lanes over the years, the floor is not ripped out. The surface is sanded, local repairs are made if necessary and a new coat is applied on top. This renewal takes less time than the original application.

For a daily, weekly and yearly maintenance schedule and cleaning tips for each type of stain, see our guide Epoxy Floor Maintenance and Cleaning.

What determines the cost?

The cost of self-leveling epoxy cannot be stated as a single figure; it varies with the factors below.

  • Size of the area: In large, open areas the crew and equipment work efficiently. In small, partitioned areas with many corners, the share of labor increases.
  • Condition of the concrete: On sound, flat concrete the preparation is short. On floors that are oil-soaked, cracked, previously painted or undulating, grinding, repairs and a filler coat are additional items.
  • Thickness: In a poured system material consumption is directly proportional to thickness; a 3 mm coat means half as much material again as a 2 mm coat.
  • Need for primer and filler: Absorbent concrete that calls for a second coat of primer, and rough concrete that calls for a scrape coat, both affect the total.
  • Topcoat and finish: A matte or scratch-resistant topcoat is a separate layer.
  • Details: Coved skirting, joint sealing, the areas around channels and drains, machine feet, lines and markings.
  • Scheduling: Night or weekend work, splitting the job into a large number of phases, and setting the crew up again for each phase.

When comparing two quotations, it is necessary to look not only at the total amount but also at the stated thickness, the surface preparation method and the number of layers. Of two jobs offered under the same name, one may be 1 mm and the other 3 mm.

We explain what to look for when comparing quotes in our article 7 Factors That Determine the Cost of Epoxy Flooring per m².

Requesting a quote

For self-leveling epoxy flooring, all you need to do is fill in the quotation form. The following information speeds up the assessment:

  • The type of space and the approximate area to be coated in square meters.
  • The existing floor: concrete, screed, ceramic tiles or an old coating; a few photographs if possible.
  • When the concrete was poured, and whether the floor has any moisture, oil or crack problems.
  • The traffic that will pass over the floor: pedestrians, pallet jacks, forklifts, racking loads.
  • Sections that get wet or come into contact with chemicals.
  • The color and finish you would like, and the dates and hours when the work can be carried out.

With this information we prepare our itemized written quote; once the quote is approved, we finalize the application plan with a site survey and measurement. For the other systems you can look at the services page, and for details specific to your sector at the sectors page.

Key Features

  • Seamless, dust-free and liquid-tight surface
  • Self-leveling, even and reflective finish
  • 2–3 mm body suited to pallet jack and forklift traffic
  • Resistant to oil, fuel and many chemicals
  • Gloss, satin or matte finish options
  • Colors from the RAL chart; lines and markings worked into the floor
  • Fast cleaning with a scrubber-dryer
  • Worn surface can be renewed without being removed

Areas of Use

  • Production plants and factories
  • Warehouses and logistics centers
  • Laboratories and cleanrooms
  • Hospitals and healthcare areas
  • Retail stores, supermarkets and showrooms
  • Schools, offices and shared areas
  • Auto repair shops and workshops

Technical Details

Thickness2–3 mm (1.5–5 mm depending on requirements)
SystemPrimer + (filler coat if needed) + self-leveling coat
ApplicationNotched trowel and spiked roller
Substrate conditionConcrete at least 28 days old, moisture below 4%
Open to foot trafficApprox. 24 hours
Full cure7 days (20 °C)
FinishGloss, satin or matte

Frequently Asked Questions

How thick is self-leveling epoxy flooring applied?

Self-leveling epoxy is generally applied at a thickness of 2–3 mm. In areas with foot traffic only, such as offices and classrooms, it can go down to 1.5 mm, and on floors that carry heavy wheel loads it can go up to 5 mm. The thickness is set by the notch height of the trowel and the amount of material poured per square meter. A coat drawn thinner cannot flow out properly and leaves trowel marks, so the thickness is not a matter for bargaining but a condition for the system to work. Having the thickness clearly stated in the quotation makes comparison easier.

How many days does it take before a self-leveling epoxy floor can be used?

The floor can be walked on about 24 hours after the pour; it reaches its full strength in 7 days at 20 °C. Light foot traffic is possible in the days in between, but forklift traffic, racking installation, the positioning of heavy machinery and chemical contact should wait for the full cure. These times lengthen as the temperature falls; below 10 °C curing slows down markedly. The total duration of the job varies with the size of the area and the extent of the surface preparation, because waiting time is needed between the layers as well.

Is a self-leveling epoxy floor slippery?

When dry it is not slippery; it can be walked on safely in ordinary shoes. Because its surface is smooth, however, it can become slippery with water, oil or detergent on it. For this reason, in production sections that are constantly wet, in wash-down areas, in back-of-house kitchen areas and on ramps, textured epoxy with quartz sand is used instead of a smooth coating. At entrances that get wet only occasionally, matting and a matte topcoat are usually enough. In the same facility the dry sections can be smooth and the wet sections textured, with the two surfaces joined in the same color.

Can self-leveling epoxy be applied over ceramic tiles or an old coating?

Yes, if the tiles are sound it can be applied over them without demolition. First the tiles are tapped one by one to identify those that sound hollow; loose or hollow tiles are removed and the gap is filled. The glazed surface is roughened mechanically, the joints are filled and a primer suited to the surface is selected; otherwise the joint lines may show through the coating over time. When applying over old epoxy or paint, the existing coat must be well bonded to the concrete; blistered or peeling areas are stripped back to the concrete.

Does self-leveling epoxy correct an uneven or sloping floor?

No, a 2–3 mm coating does not remove large differences in level or hollows; it covers minor roughness and follows the general shape of the concrete. On undulating or pitted floors repairs are carried out first, the surface is trued up with a filler coat if necessary, and then the coating is poured. Because the material is fluid, it tends to run downhill on surfaces with a pronounced slope; this is why a textured system is used on ramps instead of self-leveling. The preparation required is listed as a separate item in the quotation; the flatness of the floor is measured and confirmed during the site survey carried out once the quotation is approved.

Is there an odor during application, and can it be done while the business is operating?

Because self-leveling epoxy contains no solvent, its odor is far lower than that of solvent-based paints and disperses quickly with ventilation. The work can be done while the business is operating; the area is divided into zones, and while one section is closed off and coated, work continues in the others. Two points need attention: the dust produced during surface preparation, and the fact that the wet floor cannot be stepped on for about 24 hours. The grinding machines run connected to industrial vacuum cleaners; sensitive products and machines are covered all the same. Odor-sensitive products such as food are moved away from the application zone.

Guides and Articles on This Topic

All Articles

Sectors Where This System Is Used

All Sectors

Turn your floor into a durable, hygienic and attractive surface.

Our priority is

Tell us about your project, and together we will pin down the right epoxy system for your floor, the application time and our quote.

Get a Quote

5-year workmanship and 10-year product warranty. We respond to all requests within 24 hours. We work in all 81 provinces.