Hotel and Hospitality Facility Epoxy Flooring

Hotel and Hospitality Facility Epoxy Flooring

Seamless, anti-slip and easy-to-wash epoxy flooring for hotel kitchens, laundries, service corridors and plant rooms, plus decorative epoxy floors for lobbies and restaurants.

In Brief

Hotel epoxy flooring is used mostly in back-of-house areas such as the kitchen, laundry, service corridors and plant rooms; its seamless surface holds no dirt and withstands frequent washing. Wet and greasy sections get 3–5 mm textured (anti-slip) epoxy, corridors and storerooms get 2–3 mm self-leveling epoxy, plant rooms get epoxy paint and the lobby gets metallic epoxy. The work is scheduled section by section for the off-season or for days when occupancy is low. Epoxy is not the right choice for points where hot water and steam are discharged continuously or for outdoor surfaces.

Hotel and Hospitality Facility Epoxy Flooring

Why is epoxy chosen for hotel floors?

Mention hotel epoxy flooring and a gleaming lobby is the first thing that comes to mind; yet the places where a hotel floor is under the most strain are the back-of-house areas that guests never see. The kitchen, the dishwashing area, the laundry, the storerooms, the service corridors and the plant rooms work twenty-four hours a day. In these areas the floor is constantly wet and greasy, loaded carts roll over it, and it is washed down several times a day.

Ceramic tile, which is common back of house, loses out to this pace at its joints. The grout is washed out, grease and food residue settle into the gaps, and odor and pest problems begin. The wheels of service carts chip the edges of the tiles, and a broken tile is both a trip hazard and a hygiene problem. In plant rooms left as bare concrete, meanwhile, dust is carried to the pumps and electrical panels.

An epoxy coating covers these areas with a single, liquid-tight surface. With no joints, dirt has nowhere left to hide; the anti-slip texture protects staff working on a wet floor; and the coved skirting at the base of the walls makes the corners washable. In front-of-house areas, its seamless and decorative surface gives the architect more to work with in lobbies, restaurants and spa entrances.

Another decisive factor in a hotel is time. Noise, dust and odor are unwelcome while guests are in the building, and the kitchen cannot close for even a single day. That is why the work program matters as much as the choice of system on hotel projects. On this page we deal with the two together.

Where is epoxy flooring used in hospitality facilities?

Every part of a property wears its floor in a different way. Below you will find the areas we work in most often in hospitality facilities, what stresses the floor in each of them, and which system is chosen and why.

Hotels: city and business hotels

City hotels are open twelve months of the year and are mostly tight, multistory buildings. The kitchen is in the basement, the laundry is one level below it and the loading door opens onto the back street; all service traffic passes through narrow corridors and freight elevators. In a building like this, flooring work is almost always carried out while the hotel is operating, and section by section.

In most of the back-of-house areas, textured epoxy and self-leveling epoxy are used together; floor pantries, staff locker rooms and dry stores are handled within the same scope. In the lobby, the meeting room foyer and the restaurant entrances that guests see, metallic epoxy gives a seamless and distinctive look. In these areas, suitcase wheels and sand carried in on shoes scratch the surface; for this reason a protective polyurethane topcoat is applied and a good mat is placed at the entrance. If the hotel has an enclosed parking garage, the systems on our parking garage epoxy flooring page apply.

Resorts

Resorts are spread over a large site: the central kitchen, several restaurants, bars, the laundry, the staff dining hall, storerooms and plant buildings are a long way from one another. A central kitchen that turns out thousands of meals a day is, as far as the floor is concerned, no different from a food production plant. At properties close to the shore, the groundwater level can be high; in basement and semi-basement back-of-house areas, the moisture content of the concrete must always be measured.

Most of a resort is outdoor space, and here we need to be clear. Epoxy is not the right choice for surfaces exposed directly to sun and rain, such as pool surrounds, open terraces and the outdoor roads used by service vehicles; it yellows in the sun and its surface chalks. Epoxy is used in enclosed spaces such as kitchens, storerooms, laundries, the indoor kids' club, the game room and the spa. At properties that operate seasonally, the application is scheduled for the period between closing and reopening.

Kitchens

A hotel kitchen floor faces water, grease, heat and impact all at once. Grease spatters in front of the cooking line, the floor in the dishwashing area never dries, pots and gastronorm pans are dropped, and loaded service carts grind into the floor as they turn. For this reason, textured epoxy with quartz sand is applied in the kitchen at a thickness of 3–5 mm. In sections that are constantly wet and greasy, a coarser texture is chosen; in cold preparation areas and service passes, it is kept finer.

Three details determine the result in a kitchen: an adequate fall toward the drains, watertight detailing around drains and channels, and coved skirting at the base of the walls. We also state one limit from the outset: at points where water and steam above 60 °C are discharged continuously, such as in front of tilting skillets, boiling kettles and steam ovens, thermal shock wears epoxy down; under these conditions epoxy is not the right choice, and we state this plainly at the quotation stage. For hygiene criteria, see our food processing plant epoxy flooring page.

Laundries

In a hotel laundry the floor is permanently damp. Water overflowing from the washers, alkaline and chlorinated chemicals such as detergent and bleach, steam from the ironing section and lint drifting in the air all share the same space. Carts full of wet linen are heavy, and on their small wheels they put high pressure on the floor. In this environment the joints of ceramic tiles empty out quickly and trap lint.

Here, anti-slip textured epoxy is applied together with a fall toward the drains. The texture is chosen fine enough that lint does not stick to the surface and carts can be pushed with ease. Washers and extractors vibrate as they run, and most of them are fixed to concrete plinths; the coating is turned up over the plinth, and the area around the anchor points is sealed so that no water gets in. The inside of the open channels into which the machines discharge hot water is assessed separately, because it is exposed to constant thermal shock. If the clean and soiled linen zones are coated in different colors, the workflow can be read from the floor.

Plant rooms

The boiler room, pump room, generator room, air handling unit room, water tank room and electrical panel rooms are the hotel's unseen infrastructure. Foot traffic in these spaces is light; the problem is dust. Dust from bare concrete is carried to fans and filters, pump seals and electrical panels. In addition, fuel, oil and water leaks soak into the concrete and leave lasting stains and odors.

In plant rooms, epoxy floor paint is usually sufficient: it stops dusting, makes leaks visible and wipeable, and gives the maintenance team a clean place to work. On a light-colored floor, dripping oil or water is noticed straight away, which helps a fault to be caught early. Machine plinths and walkways can be painted in a different color. At points where spills are likely, such as around the generator and the fuel tank, a thicker system is considered. The insulating mats used in front of electrical panels are a separate occupational safety measure; the floor coating does not take their place.

Service corridors

Service corridors are the arteries of a hotel. Housekeeping carts, food and dish carts, laundry cages, beverage crates and waste containers travel back and forth along the same line all day long. Because the wheels always follow the same track, wear develops in strips; the areas in front of the elevators and the turning points are where the floor suffers most. On ceramic tile, each joint jolts the wheel as it passes: this is where the rattling of plates and the noise come from.

In corridors, 2–3 mm self-leveling epoxy provides a seamless rolling surface; carts are quieter and take less effort to push. In sections that people leave the kitchen through with wet wheels and shoes, the surface is given a light texture. Skirting is formed at the base of the walls together with the coating. At the wet and sloped points the corridor connects to, such as the waste room and the loading ramp, a textured system is used. Direction arrows and the separation of clean and soiled routes can be marked on the floor in color; this makes the job easier for newly hired staff.

Which epoxy system should be chosen?

In a hotel there is no floor that can be solved with a single system. Three questions determine the choice: how wet does the floor get, what passes over it, and do guests see it?

  • Kitchen, dishwashing area, laundry, waste room and loading ramp: Textured (anti-slip) epoxy, 3–5 mm. It provides safe footing on wet and greasy floors and withstands the load of carts and dropped pans.
  • Service corridors, dry stores, staff locker rooms and dining areas: Self-leveling epoxy, 2–3 mm. Its seamless, level surface makes wheeled traffic easier and is quick to clean.
  • Plant rooms, archives and little-used storerooms: Epoxy floor paint. The aim is to stop dusting and make leaks visible; a thin film is enough for this job.
  • Lobby, restaurant, bar and spa reception areas: Metallic and decorative epoxy. The pattern comes out differently in every installation; a clear polyurethane topcoat is applied over it against scratching and yellowing.
  • Server and systems rooms: If the equipment needs to be protected from static discharge, anti-static epoxy is considered.
  • Indoor fitness and activity rooms: Self-leveling epoxy, with rubber tiles laid over it in the weight zones. The details are on our gym epoxy flooring page.
  • Glass-fronted, sunlit enclosed spaces: A polyurethane topcoat over the epoxy. It delays yellowing; however, even this is not enough for surfaces that are fully outdoors.

How is epoxy flooring installed in a hotel?

  1. Site survey and measurement: The areas are measured, and the soundness of the existing ceramic tile and the moisture content of the concrete are checked. We note the position and level of the drains, where water ponds today and which equipment can be dismantled. The work program is prepared together with the chief engineer and the head chef.
  2. Moving the equipment and separating the area: Movable counters, shelving and carts are taken out. The area is closed off from the working section with a dust curtain, and the ventilation grilles are protected.
  3. Surface preparation: The concrete is opened up by diamond grinding with dust extraction or by shot blasting. Surfaces that have absorbed grease are first washed with a degreaser. Sound ceramic tile is roughened; hollow and broken tiles are removed.
  4. Repairs and correcting the fall: Broken areas, emptied joints and cracks are filled with an epoxy-based repair compound. Where water ponds, the fall is corrected toward the drain.
  5. Drain, channel and skirting details: The edges of drains and channels are detailed so that they are watertight. Coved skirting is formed at the base of the walls, and the coating is turned up around plinths and columns.
  6. Primer: Epoxy primer is worked into the surface. On basement floors found to be damp, a primer suited to those conditions is selected.
  7. Coating: In wet areas, quartz sand is broadcast while the epoxy coat is still wet, the excess is swept off and the surface is locked in with a topcoat. In corridors, self-leveling epoxy is poured; in plant rooms, the paint is applied in two coats by roller.
  8. Curing and return of the equipment: The floor can be walked on after about 24 hours. A longer wait is needed before heavy equipment is put back and before intensive washing; full cure takes 7 days at 20 °C.
Hotel and Hospitality Facility Epoxy Flooring – application view

Application while the hotel is operating: planning around season and occupancy

The schedule for flooring work in a hotel is set up differently from the start, depending on the type of property.

At seasonal properties the easiest period is between closing and reopening. The entire kitchen and laundry can be cleared at the same time, and odor and noise disturb no one. The point to watch is temperature: in unheated enclosed spaces in the winter months, the floor gets cold and epoxy cures slowly. If the floor temperature is low or condensation is forming on the surface, no application is carried out; if necessary, the space is heated and dehumidified. The weeks before the season are when every property is renovating; scheduling the work for right after closing eases both the calendar and the curing time.

At hotels that are open all year round the work is carried out by splitting it across low-occupancy days and across sections:

  • Kitchen: The hot line, cold preparation, the dishwashing area and the storerooms are handled as separate phases. The work of the section that is closed is moved temporarily to another counter or to a second kitchen. On those days, the menu is simplified together with the chef.
  • Laundry: During the phase, washing is kept going by outsourcing it or by moving it to the night shift; the machines are taken out of service group by group.
  • Service corridors: If the corridor is too narrow to be split in two lengthwise, an alternative route is designated. The areas in front of the elevators are done at night.
  • Lobby and restaurant: The guest entrance is moved temporarily to a side door, or the work starts after breakfast service and continues through the night.

The systems we use are solvent-free and low in odor. Even so, the ventilation of kitchens and corridors is often connected to the guest areas; during application the relevant grilles are closed and the area is ventilated separately. The grinding machines run with dust extraction, and noisy preparation work is moved to daytime hours when guests are out of their rooms.

Where epoxy is not the right choice, and common mistakes

A coating applied in the wrong place causes problems in a short time, even with the best material. These are the situations we come across most often on hotel projects:

  • Continuous hot water and steam: At points where boiling water is discharged directly onto the floor and in channels that are cleaned with steam, epoxy does not withstand thermal shock for long. These points must be dealt with separately.
  • Outdoors: Pool edges, open terraces and outdoor walkways are exposed directly to sun and rain. Under these conditions epoxy yellows and dulls; we do not recommend epoxy for these places.
  • Damp basement slab: If the moisture content of the concrete is not below 4%, or if water vapor pressure is rising from below, the coating blisters. This is why the moisture of the concrete is always measured before application, during the site survey carried out once the quote is approved.
  • Coating without correcting the fall: Epoxy follows the existing fall. If water ponds today, it will pond after coating as well; the fall is corrected before the coating is applied.
  • A smooth, glossy surface in the kitchen: A kitchen floor left smooth so that it wipes clean easily becomes dangerously slippery once it meets grease.
  • A texture coarser than necessary: Conversely, if the coarsest texture is applied everywhere, cleaning becomes harder and dirt settles into the texture.
  • Putting the equipment back too early: If heavy equipment such as ovens, refrigerators and washers is put back before the coating has hardened sufficiently, the feet leave marks.
  • Closing a structural joint: The building's expansion joints are not covered over with the coating; they are protected with a flexible sealant.

Cleaning and maintenance

An epoxy floor is easy to maintain, but the cleaning method differs for each section. The wrong method shows itself most on textured surfaces.

  • Kitchen and dishwashing area: At the end of the shift, the floor is washed with a degreasing detergent suited to the floor and a stiff brush or a scrubber fitted with brushes, rinsed with plenty of water and pulled to the drain with a squeegee. On a textured surface a mop only spreads the dirt around.
  • Laundry: Lint is first collected dry, and then the floor is washed. Spilled bleach and concentrated chemicals are rinsed away without delay.
  • Service corridors: A daily damp mop or a floor scrubber is sufficient. Cart wheels are checked from time to time; a wheel with a piece of metal or broken glass embedded in it scratches the floor from one end to the other.
  • Lobby and restaurant: A microfiber mop and a neutral detergent are used. Abrasive pads and powder cleaners spoil the gloss. Felt pads are fitted to furniture legs.
  • Plant rooms: Leaks are wiped up when they are noticed, and the surface is swept at regular intervals.

At the end of each season or once a year, the areas around drains, the door thresholds and the points where carts turn should be inspected. Minor damage is repaired on the spot. A worn topcoat can be renewed by lightly sanding the surface; this operation fits into a few days of low occupancy.

For a daily, weekly and yearly maintenance schedule and cleaning tips for each type of stain, see our guide Epoxy Floor Maintenance and Cleaning.

What determines the cost?

On hotel projects, the same number of square meters calls for very different amounts of labor from one section to another. These are the main items that make up the cost:

  • Type of area: A flat storeroom and a kitchen with drains, channels and plinths do not call for the same labor. In wet rooms, detailing takes up as much of the job as the coating itself.
  • Condition of the existing floor: Whether the ceramic tile will be removed or coated over, along with grease-soaked concrete, broken areas and any need to correct the fall, determines the preparation cost.
  • System and thickness: Paint in a plant room is the most economical option. Thick quartz-filled systems and metallic applications call for more material and more skill.
  • Details: The length of coved skirting, the number of drains and channels, the plinth surrounds, color separations and lines are calculated separately.
  • Number of phases and working hours: Splitting the job into a large number of small phases and working at night means the crew has to come to the property many times.
  • Location and access: The conditions for getting machines and materials down to basement levels and how easy the property is to reach affect the duration.

The way to use the budget efficiently is to give each section the system it needs. Installing a kitchen system in a plant room is unnecessary spending; making do with paint in the kitchen means having the job done again before long.

We explain what to look for when comparing quotes in our article 7 Factors That Determine the Cost of Epoxy Flooring per m².

Getting a quote

We set out the right system and a workable work program for your property in a written quote prepared from the information and photos you send us; once the quote is approved, we survey and measure the area on site. To get started, you can fill in the quote request form. The following information makes our work easier:

  • The type of property, where it is located and whether it operates seasonally or all year round,
  • The sections to be coated and their approximate areas in square meters,
  • The existing floor: ceramic tile, concrete or an old coating,
  • The points in the kitchen and laundry where hot water or steam is discharged,
  • The date range that suits the application and how long the sections can be closed,
  • Photos of the floor and the areas around the drains, if available.

You can see similar jobs on the projects page and the full range of systems we install on the services page. For anything you are unsure about, you can write to us through the contact page.

What Epoxy Flooring Delivers in This Sector

  • Seamless back-of-house floor that holds no dirt or odor
  • Anti-slip texture on wet and greasy kitchen floors
  • Withstands frequent washing and cleaning chemicals
  • Quiet, level rolling surface for service carts
  • Coved skirting and watertight drain details
  • Dust-free surface in plant rooms that shows up leaks
  • Decorative metallic option for the lobby and restaurant
  • Work program split into phases or scheduled for the off-season

Areas Where It Is Applied

  • Hotels
  • Resorts
  • Kitchens
  • Laundries
  • Plant rooms
  • Service corridors

Technical Details

Kitchen and laundryTextured (anti-slip) epoxy, 3–5 mm
Service corridors and storeroomsSelf-leveling epoxy, 2–3 mm
Plant roomsEpoxy floor paint, 0.3–0.5 mm
Lobby and restaurantMetallic epoxy with a polyurethane topcoat
DetailsCoved skirting, detailing around drains and channels
Open to foot trafficApprox. 24 hours
Full cure7 days (20 °C)

Frequently Asked Questions

Does epoxy flooring in a hotel kitchen withstand hot water and grease?

It withstands grease, detergent and the warm to hot water used when washing down a kitchen; the textured system is designed for these conditions. The limit is continuous thermal shock: at points where a boiling kettle or tilting skillet discharges water above 60 °C directly onto the floor, and in channels cleaned with steam, epoxy wears over time. If there are such points, we flag them separately at the quotation stage and make our recommendation by setting apart the sections where epoxy is suitable.

Can epoxy be applied while the hotel is open, and will guests be disturbed?

It can; at hotels that are open all year round, this is how the work is done anyway. The area is divided into sections, and each section is closed on days when occupancy is low. Solvent-free systems are low in odor, and the ventilation grilles of the section being coated are closed to keep the odor from reaching the guest floors. Grinding is done with dust-extraction machines and during daytime hours. The only work that affects guests directly is in front-of-house areas such as the lobby; this is solved by working at night.

How many days will the kitchen or laundry stay closed?

The duration depends on the size of the area, whether the ceramic tile is to be removed and whether the fall needs correcting; this is why the exact number of days is given after a site survey. The general framework is as follows: preparation, primer and the coating layers are spread over consecutive days, and the floor can be walked on about 24 hours after the final coat. A few more days are needed before heavy equipment is put back and before intensive washing. When the work is done section by section, the whole kitchen is never closed at the same time.

Can epoxy flooring be applied around a pool or on an open terrace?

No, we do not recommend epoxy for outdoor surfaces. Epoxy yellows in direct sunlight and its surface dulls; rain and temperature swings also put the coating under strain. A polyurethane topcoat delays yellowing in sunlit enclosed spaces, but it does not make a fully open pool surround suitable for epoxy. Epoxy is considered for enclosed areas such as the plant rooms of an indoor pool, the spa and the locker room sections.

Can epoxy be applied over the existing ceramic tile in a kitchen without removing it?

If the ceramic tile is firmly bonded to the floor, epoxy can be applied over it without removal. The tiles are checked one by one, hollow and broken ones are taken out and the gaps filled, and the surface is roughened by diamond grinding and degreased. In kitchens, however, water may have seeped through the joints for years and left voids under the tiles; in such cases, removing the ceramic tile completely is the sounder option. And if the existing fall is inadequate, coating over the tile will not solve that problem.

Is metallic epoxy in a hotel lobby slippery, and does it scratch easily?

It is not slippery when dry; when wet, like any glossy surface, it can become slippery. That is why a long mat that traps water and sand needs to be placed at the entrance and the floor kept dry on rainy days. If desired, a matte topcoat can be chosen to reduce slipperiness and glare. Against scratching, a clear polyurethane protective coat is applied over the metallic layer. Suitcase wheels and sand can leave fine marks over time; these marks are removed by renewing the topcoat.

Guides and Articles on This Topic

All Articles

Epoxy Types Used in This Sector

All Services

Turn your floor into a durable, hygienic and attractive surface.

Our priority is

Tell us about your project, and together we will pin down the right epoxy system for your floor, the application time and our quote.

Get a Quote

5-year workmanship and 10-year product warranty. We respond to all requests within 24 hours. We work in all 81 provinces.