Hospital Epoxy Flooring for Healthcare Facilities

Hospital Epoxy Flooring for Healthcare Facilities

Seamless, coved and disinfectant-resistant epoxy flooring for hospitals, operating rooms, laboratories and clinics, with an anti-static system in the rooms that need it and an anti-slip system in wet rooms.

In Brief

Hospital epoxy flooring is a one-piece floor system with no joints or seams that withstands disinfectants and meets the wall in a curved cove base. A 2–3 mm self-leveling epoxy is used in corridors and rooms, anti-static epoxy in operating rooms, textured anti-slip epoxy in wet rooms and epoxy paint in plant rooms. The surface can be walked on after about 24 hours and is fully cured in 7 days; the work is carried out by closing departments in turn.

Hospital Epoxy Flooring for Healthcare Facilities

Why is epoxy the preferred choice for hospital floors?

Hospital epoxy flooring allows the floor in a healthcare building to do two jobs at once: to carry foot and wheeled traffic that goes on around the clock, and to withstand, without deteriorating, the disinfection that is carried out every day, and in some departments several times a day. Here the floor is not merely a building element but a part of the infection control regime.

With jointed floor coverings the problem lies not in the tile itself but in its joint. Cement-based grout is porous; over time it absorbs dirt, blood and cleaning water, its color darkens and a film forms that cannot be removed by wiping. With sheet flooring, on the other hand, the seams and the base of the walls are the weak points; water that seeps beneath a seam that has opened up can remain there unnoticed.

Because an epoxy coating is applied to the floor as a liquid and hardens in place, it contains no seams or joints. When it meets the wall in a curved cove base, the room is cleaned like a one-piece basin with no corners. The surface is non-porous; a spilled liquid does not soak in, it stays on top and is wiped away.

What healthcare facilities expect from a floor can be summarized roughly as follows:

  • Cleanability: No joints, cracks or corners left for dirt to cling to.
  • Chemical resistance: Resistance to surface disinfectants and to spills of antiseptics.
  • Wheeled traffic: A surface that is not crushed or marked under stretchers, patient beds, medication and meal carts and mobile equipment.
  • Safety: A texture that reduces slipping in sections that get wet, and control of static electricity in the rooms that need it.
  • Uninterrupted service: Repairs and renewal that can be carried out in a short time without closing the whole department.

Where is it applied in healthcare facilities?

The floor is not stressed in the same way in every department. A system that is right for a corridor may be inadequate in an operating room and slippery in a sterilization unit. Below you will find the areas we work in most often and the details we pay attention to in each of them.

Hospitals: corridors, patient floors and the emergency department

In the general circulation areas of hospitals it is wheels that tire the floor the most. Patient beds, stretchers and service carts travel back and forth along the same line all day, and they turn in front of doors and at elevator entrances. In these areas we apply self-leveling epoxy 2–3 mm thick: because the surface is flat the wheels turn quietly and without jolting, and because there are no joints the stretcher does not catch. Since blood and body fluids are spilled frequently in the emergency department, choosing a light, plain color means that dirt is seen at once. In corridors we recommend a satin finish instead of a gloss one; the reflection of the ceiling lighting on the floor can create the illusion of a wet floor, particularly for elderly patients. Bands in a different color can be laid into the floor to separate departments or to show the way. The points where beds turn, such as the areas in front of elevators and the service entrances, are the places that wear fastest; in these zones particular importance is attached to the abrasion resistance of the topcoat.

Operating rooms

Operating rooms are the rooms in which the most is expected of the floor: constant disinfection, sensitive electronic equipment and flawless cleanability. In these rooms anti-static (ESD) epoxy is applied. The system consists of a primer, copper tapes connected to the grounding line of the building, a conductive primer and a conductive self-leveling coat. In this way the static charge that builds up on personnel and equipment flows to ground without a sudden discharge. When the work is finished the surface resistance is measured and the measurement record is handed over. Which resistance range is required is written in the technical specification of the project, and we plan the application according to that value. The wall junctions are always coved, and no difference in level is left at the door threshold. The fixing points of the operating table and of equipment anchored to the floor should be determined before the coating, and no holes should be drilled in the floor afterwards. A matte or satin surface is chosen; the powerful light of the surgical lamp produces reflections on a glossy floor that tire the eyes.

Laboratories

The test of a laboratory floor is chemicals. In biochemistry, microbiology and pathology laboratories, stains, alcohol, acid and alkali solutions and tissue fixatives are used. Self-leveling epoxy withstands short-term spills of most of these substances; for concentrated acids and strong solvents, however, a resin with enhanced chemical resistance has to be selected. This is why we ask for a list of the chemicals in use before preparing a quotation. Although stains do not damage the surface, they can leave a mark if they are left standing; a mid-tone gray or beige shows these marks less. The places where heavy equipment such as centrifuges, deep freezers and analyzers will sit must be flat, so leveling before the coating becomes important here. The areas under the benches and behind the equipment are coated too; edges left half finished become a path for leaks. Because the likelihood of spills is high in the blood collection and specimen reception sections, the base of the walls is coved.

Clinics

Private clinics are most often located on one floor of an office building or business center; the existing floor is ceramic tile, laminate or an old screed. The expectation here is twofold: hospital-level cleanability in the examination and procedure rooms, and in the reception area a look that suits the identity of the clinic. Plain-colored self-leveling epoxy can be used in the rooms and, if desired, metallic epoxy in the waiting and reception section. Because sound, well-bonded ceramic tile can be coated without being removed, the renovation is carried out without demolition and rubble. In clinics the work is generally planned so that it starts on Friday evening and is ready for Monday morning. In rooms where interventional procedures are performed, such as aesthetics, dermatology and ophthalmology, we recommend a coved base; even in small rooms it noticeably shortens the cleaning time. The transition between the reception area and the examination rooms is resolved with a straight line positioned under the door.

Outpatient clinics

In outpatient clinics, what tires the floor is that thousands of footsteps gather at the same points in the course of a day: the area in front of the registration desk, the queuing area, the blood collection unit and the doors of the examination rooms. Sand and mud from outside are carried in on shoes and abrade the surface like sandpaper. For this reason we recommend leaving an effective entrance matting zone and using an abrasion-resistant matte or satin topcoat on the coating. Here self-leveling epoxy provides both durability and a surface that is easy to wipe. A cove is formed in the blood collection and injection rooms. In waiting areas chair legs create point loads and scratches; fitting protective caps under the legs extends the life of the surface. If colored wayfinding bands for each specialty are laid into the floor, patients find their way without looking for signs. In rooms that get wet, such as toilets and accessible washrooms, a fine sand texture is preferred.

Dental clinics

In dental clinics the detail that governs the floor coating is the services. The water, air, suction and electrical lines of every dental unit come up out of the floor; if the surrounds of these outlets are not joined to the coating in a watertight manner, water leaks travel beneath the screed. The coating should not be applied until the unit positions are final, and the service boxes should be fixed in advance. In the treatment rooms we use plain-colored self-leveling epoxy; a light-toned floor without a pattern is useful so that small instruments and burs that have been dropped are easy to find. In the plaster and model room, plaster dust and water are found together, and a finely textured surface is safer here. For the plant enclosure that houses the compressor and the suction motor, epoxy floor paint is sufficient. The sterilization corner, small as it may be, should be coved and suitable for wet wiping. In the panoramic X-ray room the points where the machine will be anchored to the floor are also determined before the coating; anchor holes drilled afterwards break the watertightness.

Veterinary clinics

In veterinary clinics it is not people but animals that put the floor to the test. When urine and feces soak into a porous floor the odor becomes permanent; on a seamless epoxy surface, by contrast, the liquid stays on top and is washed away. Claw scratches show up quickly on a glossy surface, so we choose a matte finish. In addition, dogs cannot get a grip on a smooth floor, and elderly animals and those that have had surgery in particular slip; in the examination, waiting and boarding sections we apply a fine-sand textured epoxy. The texture should be rough enough to hold a paw but fine enough to be washed easily with a brush. In the boarding and washing sections the floor needs to be given a fall toward the drain and the base of the walls needs to be protected with a cove. In the surgery room the cleanability rules of human operating rooms apply in full. Because disinfectants and odor-removal products are used frequently, the surface should be rinsed with plenty of water, and the surrounds of the feet of cages and partitions should be joined to the coating in a watertight manner.

Sterilization rooms

In central sterilization units the floor is divided into three zones, dirty, clean and sterile; separating these zones by floor color prevents staff from mixing up the flow. The washing zone is constantly wet and water containing detergent stays on the floor; here an epoxy with an anti-slip texture is used, and in the packing and sterile storage section a smooth self-leveling system. In front of the autoclaves the situation is different: the hot water and steam that run onto the floor while the machine is being unloaded are demanding for epoxy. Occasional splashes do not cause a problem, but if there is a point where the floor is in continuous contact with water or steam above 60 °C, epoxy is not the right choice there; we state this clearly in the quotation and confirm it during the site survey. Connecting the discharge lines of the machines directly to the drain eliminates this problem most of the time. The surrounds of the drains under the washer-disinfectors and sinks are joined to the coating, and the base of the walls is coved.

Which epoxy system should be chosen?

Using a single type of coating throughout a hospital either costs more than necessary or falls short in some departments. The right approach is to classify each area according to its own conditions:

  • Corridors, patient rooms, outpatient clinics, examination rooms: Self-leveling epoxy. Its flat, seamless and easily wiped surface is suited to wheeled traffic.
  • Operating rooms, imaging rooms and other rooms where the specification calls for a conductive floor: Anti-static epoxy. It carries the static charge to ground in a controlled way and is handed over with resistance measurements.
  • Kitchens, laundries, the washing zone of the sterilization unit and other wet rooms: Textured epoxy. The grain size of the quartz sand is chosen according to how wet the area gets and how it will be cleaned.
  • Plant rooms, archives, supply stores, boiler rooms: Epoxy floor paint. It stops dusting and gives a wipeable surface; it is economical in places with no heavy wheeled traffic.
  • Reception areas of private clinics and practices: Metallic epoxy. It is preferred when appearance is in the foreground, and is used together with the plain-colored system in the clinical rooms.

You can find more detailed information for hospital kitchens on our food plant floors page and for indoor parking on our parking garage epoxy flooring page. The student laboratories of medical and dental schools are covered on the educational institutions page.

Cove, threshold and drain details

In healthcare buildings the quality of a coating is determined not by the flat surface but by the edges. The right-angled corner where the floor meets the wall is the place that neither the mop nor the machine can reach. A cove means rounding this corner with a quartz-filled epoxy paste and carrying the coating up the wall, generally by 5–10 cm. In this way the washing water does not seep into the base of the wall and dirt does not collect in the corner.

At door thresholds the coating is finished at the same level as the floor of the adjoining room; no lip is left for the wheels of stretchers and beds to catch on. Where different floor coverings meet, a slim transition profile is used. The surrounds of drains and cleanout covers are joined to the coating. The expansion joints of the building, however, are not closed off beneath the coating; they are dealt with separately using a flexible filler.

How is hospital epoxy flooring applied?

  1. Site survey and measurement: The departments are walked through one by one; the existing floor covering, the moisture of the concrete, the differences in level and the clearances under the doors are measured. The sequence of work is discussed with the facilities engineering and infection control teams.
  2. Isolating the area: The section being worked on is closed off with temporary partitions and sheeting, and the ventilation grilles are protected. The aim is that dust and odor do not pass into the neighboring departments.
  3. Surface preparation: The old floor covering and adhesive residues are stripped; the concrete is opened up with diamond grinding machines fitted with dust extraction. In small rooms and along the base of the walls, hand-held machines are used.
  4. Repairs and leveling: Cracks, broken edges and voids are filled with epoxy repair paste, and differences in level are removed.
  5. Primer: Epoxy primer is worked into the concrete, the pores are sealed and the base that the coating will bond to is formed.
  6. Cove and details: The base of the walls is rounded; thresholds, drains and service outlets are prepared. In anti-static rooms the copper tapes are bonded down and connected to the grounding line.
  7. Coating: The selected system is applied; the self-leveling coat is spread with a notched trowel and de-aerated with a spiked roller, while in wet rooms quartz sand is broadcast and the surface is locked in with a topcoat.
  8. Curing and handover: The surface becomes walkable after about 24 hours. In anti-static areas the resistance is measured, and the department is cleaned and handed over.
Hospital Epoxy Flooring for Healthcare Facilities – application view

Application while the hospital is operating, and scheduling

Closing a hospital for the sake of the floor is not possible; the work is always phased. On the ward floors the rooms are vacated in turn. Corridors can be divided in two lengthwise, with one half coated first and the other half after the first has become walkable; in this way passage is never interrupted. The line where the two halves meet is planned as a straight run and is most often concealed by a band of color.

In departments that work during the day, such as outpatient clinics and imaging, the weekend is used, and in operating rooms the planned maintenance period. In units that never stop, such as the emergency department, a temporary patient route has to be created; we draw this up together with the hospital management.

The systems we use contain no solvents and are low in odor; even so, during application the ventilation of the department is kept separate from the patient areas. The times depend on the ambient temperature: at around 20 °C the surface opens to foot traffic in about 24 hours, and for wheeled loads such as patient beds and heavy equipment it is right to wait a few days. Full cure takes 7 days; because chemical resistance develops at the end of this period, we ask for damp wiping instead of heavy use of disinfectants during the first week.

Points to watch and common mistakes

  • Coating without measuring moisture: On basement and ground floors, if the moisture content of the concrete is not below 4%, the coating blisters over time. Newly poured screed and concrete must be left for at least 28 days.
  • Going over the old floor covering: Epoxy is not applied until sheet flooring and adhesive residues have been removed completely; the layer of adhesive prevents the epoxy from bonding to the concrete.
  • Applying the same system in every room: Installing a non-conductive coating in an operating room, or leaving a constantly wet washing room smooth and glossy, is expensive to put right afterwards.
  • Leaving the cove until later: If the cove base is not formed together with the coating, a line appears at the junction once again, and the seamless floor loses its point.
  • Polishing an anti-static floor: Polish and wax leave an insulating film and reduce conductivity. This information should be given to the cleaning team in writing.
  • Deciding equipment positions afterwards: Drilling anchor holes or cutting channels in the floor once the coating is finished leaves a repair scar that breaks the watertightness.

Cleaning and disinfection

The daily care of an epoxy floor is simple: damp wiping with a microfiber mop and a neutral floor detergent are sufficient for most departments. In wide corridors a scrubber-dryer with a soft pad can be used. Textured surfaces should be washed not with a mop but with a machine fitted with brushes or with a stiff brush; otherwise the dirt stays inside the texture.

The coating withstands the recommended in-use concentrations of common surface disinfectants based on chlorine, alcohol and quaternary ammonium. The point to watch is concentration and contact time: if chlorine-based products at high concentration are left on the surface for a long time, they can cause dulling and fading over time. Rinsing the surface at the end of the time stated on the product label prevents this effect.

Antiseptics containing iodine, some laboratory stains and strong colorants such as hair dye can leave a mark if they are left standing; a spill should be wiped up immediately. Abrasive pads and wire brushes scratch the topcoat and should not be used. If the surface goes dull over the years on lines that see heavy traffic, the floor is not stripped out; it is renewed by sanding it lightly and applying a new topcoat.

For a daily, weekly and yearly maintenance schedule and cleaning tips for each type of stain, see our guide Epoxy Floor Maintenance and Cleaning.

What determines the cost?

On hospital floors the cost is not determined by the material alone. The main items that affect a quotation are these:

  • Area and subdivision: The same number of square meters is not coated with the same effort in one wide corridor as in twenty small rooms. The number of rooms, the door thresholds and the length of the wall base increase the labor.
  • Condition of the existing floor: Stripping the old floor covering, cleaning off the adhesive, repairing cracks and the need for leveling.
  • System: Because of the copper tape, the conductive layers and the measurement, an anti-static coating costs more than a standard self-leveling system. Epoxy paint is the most economical option, but it is used only in suitable areas.
  • Length of the cove: The cove base is calculated not by the square meter but by the linear meter, and it is shaped by hand.
  • Working pattern: Night and weekend work, splitting the job into a large number of small phases and isolating the area afresh in each phase lengthen the duration.

For this reason our itemized quote, prepared from the floor plan, photos and the information you send us, lists these items separately; once the quote is approved, we see and measure the departments during the on-site survey and confirm which items are needed.

We explain what to look for when comparing quotes in our article 7 Factors That Determine the Cost of Epoxy Flooring per m².

Requesting a quotation

If you would like to find out the price and the duration for your hospital, clinic or laboratory, it is enough to fill in the quotation form. Adding the information below allows us to determine the right system and a realistic schedule more quickly:

  • The departments to be coated and their approximate areas in square meters; the floor plan, if there is one.
  • The existing floor covering and a few photographs.
  • The rooms in which an anti-static floor is required and the resistance value written in the specification.
  • The days and hours on which the departments can be vacated.
  • For laboratories, the main chemicals in use.

To examine the systems in detail you can take a look at the services page, and for your questions you can reach us through the contact page.

What Epoxy Flooring Delivers in This Sector

  • Seamless one-piece surface with no joints
  • Withstands common surface disinfectants
  • Curved cove base where the floor meets the wall
  • Conductive anti-static system for operating rooms
  • Flat surface suited to stretchers, beds and service carts
  • Textured anti-slip finish in wet rooms
  • Matte and satin finish options that reduce glare
  • Department-by-department application while the hospital operates

Areas Where It Is Applied

  • Hospitals
  • Operating rooms
  • Laboratories
  • Clinics
  • Outpatient clinics
  • Dental clinics
  • Veterinary clinics
  • Sterilization rooms

Technical Details

Recommended system2–3 mm self-leveling epoxy in corridors and rooms
Conductive areasAnti-static (ESD) epoxy, handed over with resistance measurements
Wet rooms3–5 mm textured (anti-slip) epoxy
Cove baseCurved epoxy cove, 5–10 cm high
Surface preparationDiamond grinding with dust extraction
Open to foot trafficApprox. 24 hours
Full cure7 days (20 °C)

Frequently Asked Questions

Does an epoxy floor withstand the disinfectants used in hospitals?

Yes, a fully cured epoxy floor is not affected by the recommended in-use concentrations of common surface disinfectants based on chlorine, alcohol and quaternary ammonium. What causes problems is using the product undiluted or leaving it on the surface for hours; in that case the gloss can decrease. Because chemical resistance is not yet complete during the first 7 days after application, we recommend damp wiping only. In departments where special chemicals are used, such as laboratories, the resin is selected according to the product list.

Why is anti-static epoxy used on operating room floors?

Because sensitive electronic equipment operates in an operating room, and a sudden discharge of the static charge generated by the movement of personnel can affect that equipment. Anti-static epoxy transfers the charge to the grounding line of the building through copper tapes and conductive layers. In appearance it cannot be told apart from standard epoxy; the difference is revealed by the resistance measurement taken at handover. The required resistance range is determined by the specification of the project. Polish must not be used on these floors, otherwise conductivity falls.

Can epoxy be applied without closing the corridors while the hospital is in service?

Yes, a corridor can be coated without interrupting passage by dividing it lengthwise into two lanes. One half is prepared and coated first, it is opened to foot traffic after about 24 hours and work moves on to the other half. Patient rooms and outpatient clinics are vacated in turn; for units that never stop, such as the emergency department, a temporary route is planned. Because the work area is separated by partitions and sheeting and the grinding machines have dust extraction, the neighboring departments are not affected. As the number of phases rises, the total duration becomes longer; we draw up the schedule together with the hospital management.

Can epoxy be applied over existing vinyl or ceramic tile flooring?

If the ceramic tile is sound it can be coated over, whereas vinyl and similar sheet flooring has to be removed. With ceramic, the tiles are checked one by one, those that sound hollow are taken out, the surface is roughened with diamond tooling and the joints are filled and leveled. Sheet flooring is removed completely, because it is flexible and the adhesive underneath prevents the epoxy from bonding; the adhesive residue is ground away down to the concrete. Which route will be followed becomes clear during the site survey.

Does an epoxy floor become slippery when wet, and is it safe for patients and the elderly?

Smooth, glossy epoxy is safe when dry, but when water stands on it, it can become slippery like any smooth floor. This is why, in sections that get wet such as patient bathrooms, kitchens, laundries and washing rooms, quartz sand is broadcast onto the surface to give it a textured finish. In corridors and rooms a matte or satin topcoat is preferred; it reduces the reflection of the lighting and prevents the floor from looking wet. The fineness of the texture is chosen with the cleaning method in mind; a very coarse texture cannot be wiped with a mop.

When can the department be used again after the application?

In an environment at around 20 °C, the department can be used on foot after about 24 hours. Waiting a few days before bringing in wheeled loads such as patient beds, stretchers and heavy equipment prevents marks from being left on the surface. The coating reaches its full hardness and chemical resistance in 7 days. In a cool environment these times become longer, which is why the area has to be heated in the winter months. Including preparation and the waiting time between coats, the work on a single department generally takes a few days; the exact duration is stated in the quotation according to the system and the size of the area.

Guides and Articles on This Topic

All Articles

Epoxy Types Used in This Sector

All Services

Turn your floor into a durable, hygienic and attractive surface.

Our priority is

Tell us about your project, and together we will pin down the right epoxy system for your floor, the application time and our quote.

Get a Quote

5-year workmanship and 10-year product warranty. We respond to all requests within 24 hours. We work in all 81 provinces.