Industrial Epoxy Flooring for Factories and Production Plants

Industrial Epoxy Flooring for Factories and Production Plants

Seamless epoxy floors for production halls that stop concrete dusting and stand up to forklift traffic, oil and chemicals. Each section gets the system that matches its own load and exposure to moisture.

In Brief

Factory epoxy flooring turns the concrete in a production area into a dust-free, seamless, easy-to-clean surface. A 2–3 mm self-leveling epoxy is chosen for dry production and assembly areas, a 3–5 mm textured (quartz-filled) epoxy for wet, oily and impact-prone sections, and anti-static epoxy for production that is sensitive to static electricity. The floor can be walked on after about 24 hours and opens to forklift traffic in 3–7 days; the work can be phased so that production does not stop.

Industrial Epoxy Flooring for Factories and Production Plants

Why is epoxy the preferred choice for factory floors?

Factory epoxy flooring is the most common way to turn the concrete of a production hall into a dust-free, seamless and chemical-resistant surface. In a production plant the floor matters not just because people walk on it, but because it carries forklifts, takes the load of the machinery, comes into contact with oil and coolant, and is cleaned every single day.

Bare concrete wears out quickly under these conditions. The weak cement laitance on its surface is ground down under the wheels and released into the air as a fine dust. That dust finds its way into the moving parts of machines, into electrical panels, onto products waiting to be painted or packed, and into the air that employees breathe. Concrete is also porous: spilled oil soaks into it, the stain becomes permanent and the floor grows slippery over time.

An epoxy coating seals the pores of the concrete and forms a hard, impermeable wear layer on top of it. Because there are no joints or grout lines, dirt has nowhere to lodge, and the floor can be washed by machine in a short time. A light-colored surface reflects light, so the hall looks brighter, and a bolt that has dropped to the floor or a leak of oil is noticed straight away.

Tile and ceramic floor coverings create a different problem under factory conditions: the joints. The hard wheel of a pallet jack delivers an impact at every joint, tile edges chip and the grout works loose. An emptied joint both collects dirt and lets liquids pass down into the layer beneath. On a seamless epoxy surface this weak point is eliminated from the outset.

Where is factory epoxy flooring applied?

Every section of a factory stresses the floor in a different way. Below, we describe one by one the plant types we work in most often, what wears the floor in each of them, and which system is chosen and why.

Production plants

In general production halls the floor does several jobs at once: pallets of raw material are moved by pallet jack, foot traffic flows between the workbenches, and crates of semi-finished goods are set down on the floor. The problem we meet most often is concrete that is dusting and has become pitted in places. In these areas a self-leveling epoxy 2–3 mm thick is usually applied; it evens out minor undulations and gives a single, continuous surface that is easy to wipe clean.

When storage islands, walkways and the areas around machines are separated by different colors inside the hall, order becomes visible of its own accord. The detail to watch is the base of the columns and the door thresholds: if the coating is finished by feathering it out thin at these points, that is where the first delamination will start. For this reason a narrow chase is cut into the concrete along the edges and the coating is keyed into that chase. In the transition lanes between production and shipping, where traffic is concentrated, the thickness is increased where necessary.

Machinery and assembly lines

On machinery and assembly lines, what stresses the floor is not traffic spread across the whole surface but point loads and constantly dripping liquids. Beneath the machine feet the load bears on a small area; oil seeping from hydraulic units, gearboxes and lubrication points drips onto the same spot for months on end. At assembly stations, meanwhile, the operator stands in the same place all day, and a small part dropped on the floor needs to be easy to find.

On these lines self-leveling epoxy performs well with its flat, light-colored surface; in maintenance zones that get oily, a textured finish is preferred. The soundest approach is to carry out the coating before the machines are installed. If the machines are already in place, the coating is cut in around them with a clean line and the areas around the anchors are sealed with a flexible filler. The joint between the foundation of a vibrating machine and the concrete of the hall is not covered over with the coating; it is left open and filled with a flexible material.

Automotive plants

In automotive plants the floor works as if it were part of the line. Along the assembly line, carrier trolleys and automated guided vehicles always follow the same track, and over time that track forms a wear lane in the floor. In the press and body shops, heavy dies and crates of sheet metal cause impact, while engine oil and brake fluid are spilled in the mechanical sections.

In assembly and final inspection areas, a smooth, light-colored self-leveling epoxy immediately reveals any leak underneath a vehicle. In sections exposed to impact, a thick quartz-filled system is chosen. Because sensitivity to dust is high around the paint shop, it is especially important there that the floor does not dust. At stations where electronic modules and batteries are assembled, anti-static epoxy is required if there is a risk of electrostatic discharge. In the lanes followed by automated guided vehicles, the flatness of the surface and the durability of the lines are planned separately. We cover the conditions on the after-sales side separately on our auto repair shops and service areas page.

Metalworking plants

In metalworking plants the floor has to contend with three things: cutting fluid, swarf and heavy parts. The coolant emulsion that splashes from lathes and machining centers keeps the floor permanently wet and slippery; sharp swarf scratches the surface under the wheels; and a casting or a die set down on the floor delivers an impact.

For this reason textured epoxy is recommended around the machine tools instead of a smooth, glossy surface; the quartz filler both reduces slipping and stands up better to scratching and impact. In assembly and measurement sections that work dry, a self-leveling system is sufficient. In welding and grinding areas there is one limit that has to be stated plainly: red-hot spatter leaves a burn mark on every resin coating. At these points it is better to think of the coating together with a protective steel plate or a welding blanket, and sometimes to leave that small zone uncoated.

Textile mills

In textile mills the difference between one department and the next is considerable. In spinning, weaving and knitting halls the real problem is airborne fiber; on a jointed or rough floor the fiber clings, cleaning becomes harder and the lint that builds up increases the fire load. Seamless self-leveling epoxy allows the fiber in these halls to be collected easily with a broom or a vacuum cleaner, and fabric roll trolleys run smoothly over the flat surface.

In garment-making and cutting departments a light-colored floor helps the lighting, and a needle that has fallen to the floor becomes visible. The dyehouse and finishing departments, however, are an entirely different environment: the floor is constantly wet, and dyes and auxiliary chemicals are spilled. Here a thick system with an anti-slip texture and an adequate fall toward the drains are required. At points where very hot water is continuously discharged onto the floor from the vats, on the other hand, epoxy is not the right choice; we say so clearly at the quotation stage.

Plastics manufacturing plants

In plastics manufacturing plants the most insidious hazard on the floor is spilled granulate. On a flat, hard surface the pellets behave like ball bearings; this is why, in the raw material feeding, under-silo and regrinding zones, a lightly textured surface is considered together with ease of sweeping. Hydraulic oil leaks are commonplace around injection molding and extrusion machines, and an impermeable coating that extends right under the machines prevents the oil from soaking into the concrete.

During mold changes, heavy molds lowered by crane and the mold trolleys create impact and point loads; in the tool room and mold holding areas a quartz-filled system lasts longer. In the packaging and finished goods sections, self-leveling epoxy is sufficient. In zones crossed by cooling water lines, if there is condensation or leakage, that source has to be dealt with before the coating is applied; an application made on wet concrete will not bond.

Food production plants

In food production plants the floor is a direct subject of inspection. In HACCP-based audits, what is expected of the floor is a surface that is impermeable, crack-free and easy to clean and that does not hold standing water. Seamless epoxy offers a base that meets this expectation, because it leaves no grout lines or pores for bacteria to cling to.

In wet process areas, in sections that are washed down and in production involving oils and fats, textured epoxy is applied; the texture is chosen fine enough not to compromise cleanability. In dry filling, packaging and shipping sections a self-leveling surface is preferred. The fall toward the drains, the edges of the channels and the junctions at the base of the walls are the details that demand the most care in these plants. Let us state one limit as well: at points that see continuous thermal shock above 60 °C, such as cooking lines or washing with hot water and steam, epoxy is not the right choice. The details can be found on our food and beverage plants page.

Pharmaceutical plants

In pharmaceutical plants the floor is part of the clean production conditions. In GMP audits, what is expected of the floor is a surface that sheds no particles, is smooth and crack-free, and withstands frequent wiping with disinfectants. This is why self-leveling epoxy is preferred in production, weighing and filling rooms: it is seamless, it does not hold dust and its surface is closed.

So that dirt does not collect in the corner where the wall meets the floor, the junction is finished as a rounded cove. Door thresholds and airlock transitions are finished without any difference in level, so that wheeled trolleys do not catch on them. In rooms where solvents are used or raw materials are processed as fine powder, electrostatic discharge can pose a risk; in these sections anti-static epoxy is applied and the surface resistance is measured and recorded. The choice of color is functional too: clean and dirty corridors, and the flows of materials and personnel, can be distinguished by different shades. For what is expected on the laboratory side, you can also look at our hospitals and healthcare facilities page.

Which epoxy system should be chosen for a factory?

There is no single right system; the right system is determined by the load, the wetness and the cleaning method of the section in question. The matching below holds true for most factories.

  • Dry production, light and medium loads: Self-leveling epoxy gives a seamless, flat surface 2–3 mm thick. It carries pallet jack and forklift traffic and is easy to clean.
  • Wet and oily sections: Textured anti-slip epoxy reduces slipping on a wet floor thanks to the texture created with quartz sand.
  • Heavy loads and impact: At 3–5 mm thick, a quartz-filled system is more resistant to impact and hard wheels than a smooth coating; it is suitable for press areas, tool rooms and the aprons in front of loading doors.
  • Production sensitive to static electricity: Anti-static epoxy carries the accumulated charge to the ground line through copper tapes.
  • Low-traffic ancillary areas: In archives, plant rooms and pedestrian corridors, epoxy floor paint prevents dusting economically. Because it is a thin film, its service life is short under heavy forklift traffic.
  • Visitor and display areas: If appearance comes to the fore in the entrance hall or the product display section, metallic epoxy can be considered.

It is quite normal for several systems to be used together in the same plant. The production hall can be coated with a self-leveling system, the wash-down section with textured epoxy and the archive with paint; the transitions are resolved with attention to matching colors and levels. In this way the budget is spent where the floor is really put under stress.

How is the application carried out?

The service life of an epoxy coating is determined by the surface preparation far more than by the material. In factories the process moves forward in the following order.

  1. Site survey and measurement: The age, soundness and moisture content of the concrete are measured; oil-soaked zones, cracks, joints and differences in level are marked. We find out about the forklift routes, the machine layout and the cleaning method.
  2. Surface preparation: The concrete is opened up by shot blasting or diamond grinding; the weak laitance layer, old paint and dirt are removed. Because the machines work with vacuum extraction, dust does not spread into the production area.
  3. Oily zones and repairs: Oil-soaked concrete is cleaned in depth and, if necessary, that layer is scraped away. Cracks, broken joint edges, pits and old anchor holes are filled with an epoxy-based repair compound.
  4. Primer: Epoxy primer is worked into the concrete; it seals the pores and prepares the base that the coating will bond to. On very absorbent concrete a second coat of primer may be needed.
  5. Coating: In a self-leveling system the material is poured, spread with a notched trowel and de-aerated with a spiked roller. In a textured system, quartz sand is broadcast onto the wet coat, the excess is swept off once it has cured, and the surface is locked in with a topcoat.
  6. Joints, lines and details: Movement joints are cut and sealed with a flexible filler. Walkways, forklift routes, storage areas and the keep-clear zones in front of electrical panels are marked out with colored lines.
  7. Curing and handover: The floor can be walked on after about 24 hours. Forklift traffic starts within 3–7 days, depending on the system and the temperature; full mechanical and chemical resistance is reached in 7 days at 20 °C.
Industrial Epoxy Flooring for Factories and Production Plants – application view

Application without stopping production, and scheduling

Most factories cannot halt production for days on end for the sake of the floor. For this reason the area is divided into phases: while one line is running, the neighboring section is coated and forklift traffic is diverted to a temporary route. The boundaries of the phases are made to coincide with existing joints or marking lines wherever possible, so that the day joint cannot be seen.

Weekends, public holidays and planned maintenance shutdowns are the most productive times. Even in a short shutdown the surface preparation and the primer can be completed; the coating layer is then placed in the schedule with its curing time taken into account. If a machine relocation or a change to a line is being planned, combining the floor work with it reduces both the time and the cost.

The systems we use are solvent-free; there is a slight smell of resin during application, but it does not prevent work from continuing in the neighboring section. Temperature, however, is decisive: when the floor temperature drops below 10 °C, curing slows down markedly. In unheated halls during the winter months, the times are extended accordingly or the space is heated.

Common mistakes and points to watch

  • Starting without measuring moisture: The concrete must be at least 28 days old and its moisture content must be below 4%. If moisture is rising from beneath the slab, the coating will blister; this is identified in advance by measurement.
  • Merely wiping oil-soaked concrete: Oily concrete whose surface looks clean will not hold the primer. No application should be made until the oil has been cleaned out in depth.
  • Covering movement joints with the coating: Concrete moves, the joint moves with it and cracks the rigid coating on top. Joints must be carried through the coating as well.
  • Applying the same system everywhere: Applying thin paint to a forklift lane ends in rapid wear, while applying a coarse-textured surface to a dry assembly area ends in difficult cleaning.
  • Loading the floor too early: The fact that it can be walked on does not mean that it is ready to carry loads. A forklift that enters too soon leaves permanent marks in a coating that has not yet hardened.
  • Not asking about the chemicals: Epoxy withstands many oils, fuels and dilute chemicals; concentrated acids and some solvents, however, can damage the surface. The list of chemicals in use should be shared before the system is selected.

A note, too, for loading yards that are open to the weather: under direct sunlight epoxy yellows and loses its gloss over time. In sections that receive sunlight, a polyurethane topcoat can be used against yellowing; yards that are entirely outdoors are assessed separately.

Cleaning and maintenance

The greatest enemy of an epoxy floor is the sand and metal swarf that travel across its surface; under the wheels they work like sandpaper. Daily sweeping or industrial vacuuming is the cheapest way to preserve the gloss of the coating. For the weekly clean, a scrubber-dryer working with a neutral detergent is sufficient; on textured surfaces a machine fitted with brushes is used instead of a mop.

Spilled oil and chemicals should be removed without delay. The coating withstands them, but a liquid left standing for a long time can leave a stain and makes the floor slippery. Dragging pallets and metal crates, fork tips scraping along the floor and damaged wheels all cause scratches; briefing the operators on this point extends the life of the floor.

Over time the places that wear the most are turning points and narrow passages. These lanes can be refreshed by sanding the surface and applying a new coat, without renewing the whole hall. Lines, too, can be repainted in the same way without disrupting production.

For a daily, weekly and yearly maintenance schedule and cleaning tips for each type of stain, see our guide Epoxy Floor Maintenance and Cleaning.

What determines the cost of factory epoxy flooring?

We do not quote prices here, because no two factory floors are alike and the right figure can only be set out in a quote prepared for your own floor. The main factors that determine a quotation are these:

  • Area and layout: As much as the total square meters, whether the area is in one piece or broken up between machines also affects the labor.
  • Condition of the existing floor: On concrete that is oil-soaked, cracked or pitted, the share of preparation and repair work increases.
  • System and thickness: Thin-film paint, 2–3 mm self-leveling, 3–5 mm textured and anti-static systems each consume a different amount of material.
  • Details: The length of the joints, the edges of channels and drains, the areas around machines and the linear meters of line marking are calculated separately.
  • Scheduling: Night or weekend work and a large number of small phases require more crew days than a job carried out in one go.

We explain what to look for when comparing quotes in our article 7 Factors That Determine the Cost of Epoxy Flooring per m².

Requesting a quotation

To receive a system recommendation and a price for your plant, you can fill in the quotation form. It speeds things up if you note in the form the approximate area, the current condition of the floor, the vehicles in use (pallet jacks, forklifts, heavy transporters), the liquids that are spilled on the floor and the days on which the work can be carried out. Adding a few photographs makes the initial assessment easier.

Once the information has reached us, we prepare our written quote together with a section-by-section system plan and a phasing plan; once the quote is approved, a day is set for the site survey and measurement. For your raw material and finished goods storage areas you can take a look at our warehouses and logistics areas page, and for the details of the systems at our services page; you can send us your questions through the contact page.

What Epoxy Flooring Delivers in This Sector

  • Seamless surface that stops concrete dusting
  • Withstands forklift and pallet jack traffic
  • Resistant to spills of oil, fuel and many chemicals
  • Anti-slip texture option for wet and oily sections
  • Line marking for walkways, forklift routes and storage areas
  • Phased application that keeps production running
  • Quick cleaning with a scrubber-dryer
  • Worn lanes can be refreshed without renewing the whole area

Areas Where It Is Applied

  • Production plants
  • Machinery and assembly lines
  • Automotive plants
  • Metalworking plants
  • Textile mills
  • Plastics manufacturing plants
  • Food production plants
  • Pharmaceutical plants

Technical Details

Recommended system2–3 mm self-leveling; 3–5 mm textured epoxy in wet and heavy-duty sections
Surface preparationShot blasting or diamond grinding (vacuum-assisted, dust-free)
Concrete conditionAt least 28 days old, moisture content below 4%
Lines and markingWalkways, forklift routes, storage areas and safety lines
Open to foot trafficApprox. 24 hours
Open to forklift traffic3–7 days, depending on system and temperature
Full cure7 days (20 °C)

Frequently Asked Questions

How many days does it take before an epoxy floor in a factory can open to forklift traffic?

An epoxy floor opens to forklift traffic within 3–7 days, depending on the system and the ambient temperature. Foot traffic can start after about 24 hours, but at that stage the coating has not yet reached its full hardness. Full mechanical and chemical resistance develops in 7 days at 20 °C. If the hall is cold these times become longer; for this reason, when the phasing plan is drawn up, the temporary route that the forklifts will use on those days is also defined.

Can a factory floor be coated without stopping production?

Yes, by dividing the area into phases the coating can be applied while production continues. While one line is running, the neighboring section is prepared and coated, and forklift traffic is temporarily diverted to another aisle. Because the machines used for surface preparation work with vacuum extraction, dust is not carried into the section that is in operation. If weekends, public holidays and planned maintenance shutdowns are put to use, the number of phases goes down and the job is completed in a shorter time.

Is epoxy paint sufficient in an area where forklifts are used?

In areas with heavy forklift traffic, epoxy paint is generally not sufficient. Paint is a thin film 0.3–0.5 mm thick; it prevents dusting, but it wears through quickly on lanes where wheels are constantly turning. In these sections a 2–3 mm self-leveling system or a 3–5 mm quartz-filled system lasts longer. Paint is a sensible solution in low-traffic ancillary areas such as archives, plant rooms and pedestrian corridors.

Can epoxy be applied to old, oil-soaked factory concrete?

It can, but it is essential that the oil is first removed from the concrete. Oily concrete whose surface appears to have been wiped clean will not hold the primer, and after a while the coating blisters in that zone. For this reason the oily zones are marked during the site survey and cleaned in depth; if necessary, the oil-soaked layer is removed mechanically and filled again with repair material. How deep the oil has penetrated directly affects the preparation time and the cost.

Does an epoxy floor withstand the chemicals used in a factory?

Epoxy is resistant to machine oils, fuel, cutting fluids, cleaning agents and many dilute chemicals. On the other hand, concentrated acids, some strong solvents and hot water or steam that is continuously above 60 °C can damage the coating. This is why, before a system is selected, we ask for a list of the substances that are likely to be spilled on the floor. If there is a condition for which epoxy is not suitable, this is stated clearly at the quotation stage.

How long does epoxy last on a factory floor?

When the right system is chosen and the surface preparation is done properly, an epoxy floor serves a factory for many years; the exact period depends on the intensity of the traffic and on maintenance. The places that wear fastest are turning points, narrow passages and the aprons in front of loading doors. These can be refreshed by sanding the surface and applying a new coat, without renewing the whole hall. Daily sweeping and removing spilled liquids without delay extend the service life markedly.

Guides and Articles on This Topic

All Articles

Epoxy Types Used in This Sector

All Services

Turn your floor into a durable, hygienic and attractive surface.

Our priority is

Tell us about your project, and together we will pin down the right epoxy system for your floor, the application time and our quote.

Get a Quote